Rockwell Collins Gets Green Light For C/KC-135 GATM Upgrade | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Wed, Apr 07, 2004

Rockwell Collins Gets Green Light For C/KC-135 GATM Upgrade

Deliveries Set For April 2005

The US Air Force has authorized Rockwell Collins to begin the $36.9M Lot II, the first phase of full rate production, as part of the C/KC-135 Global Air Traffic Management (GATM) program.  This first production phase calls for the building, delivery and installation of 30 additional R-model aircraft ship sets with deliveries beginning in April 2005.  If fully executed, the GATM program could generate $600 million in revenue for Rockwell Collins.

"We are proud of this milestone and look forward to continued success with the C/KC-135 GATM program," said Rockwell Collins Chairman, President and Chief Executive Officer Clay Jones. "This milestone is a reflection of our ongoing commitment to meet budget and schedule targets for government projects."

Last summer, Rockwell Collins officials presented the US Air Force with the first C/KC-135 production aircraft equipped with Global Air Traffic Management (GATM) technology during a ceremony in San Antonio.

Prior to this first production authorization, the $55 million Phase 1 low-rate initial production option included delivery and installation of avionics for 50 C/KC-135 tanker/transport aircraft.  The Air Force then authorized the $32 million second phase of low-rate initial production as part of the GATM program. The second phase called for the building, delivery and installation of 25 additional R-model aircraft ship sets.

As the prime avionics systems integrator for the US Air Force C/KC-135 GATM program, Rockwell Collins is providing technology that prepares aircraft for changing communication/navigation/surveillance and air traffic management (CNS/ATM) requirements as the airspace transitions to Free Flight operation.

FMI: www.rockwellcollins.com

Advertisement

More News

ANN's Daily Aero-Term (05.07.24): Hazardous Weather Information

Hazardous Weather Information Summary of significant meteorological information (SIGMET/WS), convective significant meteorological information (convective SIGMET/WST), urgent pilot>[...]

ANN's Daily Aero-Linx (05.07.24)

Aero Linx: The T-6 Racing Association The T-6 Racing Association is all about T-6‘s and racing. Our mission is to bring great racing to our fans in Reno and other venues wher>[...]

Airborne 05.01.24: WACO Kitchen, FAA Reauthorization, World Skydiving Day

Also: Electra Aero, AMO-CBP v Smugglers, Naval King Airs, Boeing Deal To the surprise of everyone involved, Waco Kitchen shut down both airport operations with little warning and h>[...]

Airborne Affordable Flyers 05.02.24: Bobby Bailey, SPRG Report Cards, Skydive!

Also: WACO Kitchen Bails, French SportPlane Mfr to FL, Dynon-Advance Flight Systems, Innovation Preview Bobby Bailey, a bit of a fixture in sport aviation circles for his work with>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC