Countdown Underway For Sunday's Launch Of Atlantis | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Thu, Aug 24, 2006

Countdown Underway For Sunday's Launch Of Atlantis

Scheduled For 1630 EDT

Three hours ago, NASA began the countdown for the launch of Space Shuttle Atlantis on mission STS-115, at the T-minus 43 hour point. During this mission, Atlantis' crew will resume the construction of the International Space Station -- the goal of the remaining space shuttle flights in the program.

The Kennedy Space Center launch team will conduct the countdown from the newly renovated Firing Room 4 of the Launch Control Center. The countdown includes 33 hours, 24 minutes of built-in hold time leading to a preferred launch time at about 4:30 pm on Sunday, August 27, with a launch window extending about five minutes.

This mission is the 116th space shuttle flight, the 27th flight for orbiter Atlantis, and the 19th US flight to the International Space Station. STS-115 is scheduled to last 11 days, with a planned return to Kennedy Space Center at about 12:02 pm EDT on September 7.

Atlantis rolled into KSC's Orbiter Processing Facility on October 18, 2002, after returning from its last mission, STS-112. Its next mission was planned to be STS-114; however, during the program delays following the 2003 loss of Columbia, Atlantis was reassigned to mission STS-115. The orbiter rolled out of the facility's bay 1 and into the Vehicle Assembly Building on July 24.

While in the building's high bay 3, Atlantis was mated to its modified external tank and solid rocket boosters. The entire space shuttle stack was transferred to Launch Pad 39B on August 2.

The STS-115 crew includes Commander Brent Jett, Pilot Chris Ferguson, and Mission Specialists Joe Tanner, Dan Burbank, Heidemarie Stefanyshyn-Piper and Steve MacLean of the Canadian Space Agency.

During mission STS-115, Atlantis will dock with the station and the crew will perform three spacewalks. The astronauts will deliver and install the 17.5-ton, bus-sized P3/P4 integrated truss segment to the station's girder-like truss backbone. The new piece will include a second set of giant solar arrays, batteries and associated electronics. Together, the trusses and solar arrays will provide one-fourth of the total power-generation capability of the completed station.

To prepare for the extravehicular activities, the spacewalkers will perform a new "campout pre-breathing exercise." These crew members will reside in the station's airlock overnight, where the pressure will slowly be reduced. Harmful gases will thereby be removed from their blood, allowing them to gradually acclimate to the lower pressure they will encounter outside the station.

Provisions are onboard to support as many as three additional spacewalks, if required to complete mission objectives.

FMI: www.nasa.gov/shuttle

Advertisement

More News

ANN's Daily Aero-Term (04.25.24): Airport Rotating Beacon

Airport Rotating Beacon A visual NAVAID operated at many airports. At civil airports, alternating white and green flashes indicate the location of the airport. At military airports>[...]

ANN's Daily Aero-Linx (04.25.24)

Aero Linx: Fly for the Culture Fly For the Culture, Inc. is a 501(c)(3) non-profit organization that serves young people interested in pursuing professions in the aviation industry>[...]

Klyde Morris (04.22.24)

Klyde Is Having Some Issues Comprehending The Fed's Priorities FMI: www.klydemorris.com>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC