AD: The Boeing Company Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Thu, Aug 16, 2018

AD: The Boeing Company Airplanes

AD NUMBER: 2018-17-03

PRODUCT: Certain The Boeing Company Model 787-8 and 787-9 airplanes.

ACTION: Final Rule.

SUMMARY: This AD was prompted by reports of failures of the lip heater assemblies of the inlet ice protection system of the cabin air compressor (CAC) due to chafing.

This AD requires changing the airplane electrical connectors and the routes of certain wire bundles, and installing new or modified left and right CAC inlet duct assemblies.

DATES: This AD is effective September 19, 2018.

COST: The FAA estimates that this AD affects 66 airplanes of U.S. registry. The cost of compliance is estimated as follows:

  • Change and installation: Labor - 20 work-hours × $85 per hour = $1,700 per aircraft. Parts - $32,937. Total cost per aircraft: $34,637.
FMI: AD

Advertisement

More News

ANN's Daily Aero-Linx (05.04.24)

Aero Linx: JAARS Nearly 1.5 billion people, using more than 5,500 languages, do not have a full Bible in their first language. Many of these people live in the most remote parts of>[...]

NTSB Final Report: Quest Aircraft Co Inc Kodiak 100

'Airplane Bounced Twice On The Grass Runway, Resulting In The Nose Wheel Separating From The Airplane...' Analysis: The pilot reported, “upon touchdown, the plane jumped back>[...]

Aero-News: Quote of the Day (05.04.24)

"Burt is best known to the public for his historic designs of SpaceShipOne, Voyager, and GlobalFlyer, but for EAA members and aviation aficionados, his unique concepts began more t>[...]

Aero-News: Quote of the Day (05.05.24)

"Polaris Dawn, the first of the program’s three human spaceflight missions, is targeted to launch to orbit no earlier than summer 2024. During the five-day mission, the crew >[...]

Read/Watch/Listen... ANN Does It All

There Are SO Many Ways To Get YOUR Aero-News! It’s been a while since we have reminded everyone about all the ways we offer your daily dose of aviation news on-the-go...so he>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC