NASA Awards Contracts For Orion Heat Shield Material | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.14.24

Airborne-Unlimited-05.15.24 Airborne-AffordableFlyers-05.16.24

Airborne-Unlimited-05.17.24

Tue, May 08, 2007

NASA Awards Contracts For Orion Heat Shield Material

Agency Seeks Reliable Backup Options

NASA announced Friday it selected The Boeing Company and Textron Systems to develop alternate heat shield materials for the Orion crew exploration spacecraft.

The two contracts for Alternate Block 2 Thermal Protection System (TPS) Materials and Heat Shield Systems Advanced Development will support development and testing of three alternative heat shield materials. The companies are challenged with developing technologies can be used as backups for the primary material, according to NASA.

Orion is scheduled to carry astronauts to the International Space Station by 2015, with a goal of landing astronauts on the moon by 2020. The Orion TPS Advanced Development Project, led by Ames Research Center, Moffett Field, CA was established to develop a heat shield to protect Orion during its return from low-Earth orbit or the moon.

In September 2006, Boeing was awarded a contract to develop the primary heat shield material, Phenolic Impregnated Carbon Ablator (PICA), manufactured by its subcontractor, Fiber Materials, Inc. based in Biddeford, ME. It will only develop the alternate material if the primary material does not perform to Orion Project specifications. NASA will assess and evaluate all of the Alternate Block 2 TPS materials through initial testing and select the most promising of the materials for further development, if needed.

The value of the Boeing contract is approximately $10 million and calls for Boeing to perform early investigation of a proprietary material, the Boeing Phenolic Ablator (BPA). Textron's contract has a value of about $24 million calls for early investigation of two proprietary material options, Avcoat, which was also used on Apollo, and Dual Layer.

Each contract has a 16-month performance period from May 4, 2007 until August 31, 2008, according to NASA.

FMI: www.nasa.gov

Advertisement

More News

Classic Aero-TV: Remembering Bob Hoover

From 2023 (YouTube Version): Legacy of a Titan Robert (Bob) Anderson Hoover was a fighter pilot, test pilot, flight instructor, and air show superstar. More so, Bob Hoover was an i>[...]

ANN FAQ: Follow Us On Instagram!

Get The Latest in Aviation News NOW on Instagram Are you on Instagram yet? It's been around for a few years, quietly picking up traction mostly thanks to everybody's new obsession >[...]

ANN's Daily Aero-Linx (05.15.24)

Aero Linx: B-52H Stratofortress The B-52H Stratofortress is a long-range, heavy bomber that can perform a variety of missions. The bomber is capable of flying at high subsonic spee>[...]

ANN's Daily Aero-Term (05.15.24):Altimeter Setting

Altimeter Setting The barometric pressure reading used to adjust a pressure altimeter for variations in existing atmospheric pressure or to the standard altimeter setting (29.92).>[...]

Aero-News: Quote of the Day (05.16.24)

"Knowing that we play an active part in bettering people's lives is extremely rewarding. My team and I are very thankful for the opportunity to be here and to help in any way we ca>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC