Project Morpheus Will Continue Development | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-Unlimited-04.23.24

Airborne-Unlimited-04.24.24 Airborne-FltTraining-04.25.24

Airborne-Unlimited-04.26.24

Wed, Aug 15, 2012

Project Morpheus Will Continue Development

Prototype Lander Destroyed In Untethered Test Flight

The second untethered test flight of the Morpheus lander being developed by NASA and did not exactly go as planned, but the lost of control of the vehicle and its subsequent impact with the ground and fire were not entirely unexpected by the development team.

"This is why we test," NASA posted on a blog for the program. "We have already learned a lot from this test, and will continue to learn as we recover data and evaluate the hardware."

NASA said that while the root cause of the accident is still being looked into, they did say that data from the Inertial Measurement Unit (IMU) that supplies navigation updates to the flight computer was lost at the start of the vehicle's ascent. The IMU tells the vehicle which way is up (along with other directional information) and the loss of that data caused Morpheus to tumble and impact the ground about 50 feet from its launch site.

"These types of incidents are expected during hardware development," NASA said on the blog. They cited long testing periods associated with the manned lunar landing and shuttle programs, and that there were failures during both. But in each case "(b)oth of those Programs found the problem, implemented a solution, and moved on to be extremely successful. We will do the same."

A second Morpheus test vehicle is already being constructed, and NASA says the program will continue at KSC "as soon as possible" with unit B.

(Image of Morpheus lander after crash and fire provided by NASA)

FMI: http://morpheuslander.blogspot.com

Advertisement

More News

ANN's Daily Aero-Term (04.26.24): DETRESFA (Distress Phrase)

DETRESFA (Distress Phrase) The code word used to designate an emergency phase wherein there is reasonable certainty that an aircraft and its occupants are threatened by grave and i>[...]

ANN's Daily Aero-Linx (04.26.24)

Aero Linx: The International Association of Missionary Aviation (IAMA) The International Association of Missionary Aviation (IAMA) is comprised of Mission organizations, flight sch>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne-NextGen 04.23.24: UAVOS UVH 170, magni650 Engine, World eVTOL Directory

Also: Moya Delivery Drone, USMC Drone Pilot, Inversion RAY Reentry Vehicle, RapidFlight UAVOS has recently achieved a significant milestone in public safety and emergency services >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC