First Hubble Hardware Arrives At KSC For STS-125 Flight | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Fri, Jul 18, 2008

First Hubble Hardware Arrives At KSC For STS-125 Flight

Scheduled For October 8 Liftoff

The first major flight hardware for the fifth and final space shuttle servicing mission to NASA's Hubble Space Telescope is starting to arrive at the Kennedy Space Center, FL to begin preparations for its targeted October launch.

Three carriers, which are pallets that will hold equipment in space shuttle Atlantis' payload bay, were delivered to Kennedy Wednesday. They will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during Atlantis' mission, designated STS-125 and SM4.

The three payload carriers are the Flight Support System (FSS), the Super Lightweight Interchangeable Carrier (SLIC), and the Orbital Replacement Unit Carrier (ORUC). At the end of July, a fourth and final carrier, the Multi-Use Lightweight Equipment (MULE) carrier, will join the others in the Payload Hazardous Servicing Facility where the Hubble payload is being prepared for launch.

The Flight Support System will attach, secure and provide power to Hubble and also contains the Soft Capture Mechanism that will assist in the de-orbiting of the telescope when its science mission is over.

Among the components to be integrated onto the carriers are the Wide Field Camera 3 that will be placed on the SLIC with Hubble's two new battery modules. The Fine Guidance Sensor and the Cosmic Origins Spectrograph will be on the ORUC, as well as the replacement gyros.

The Relative Navigation Sensors and the New Outer Blanket Layers will be on the MULE. These components, which will be integrated onto the carriers, will be delivered to Kennedy during the first half of August.

Numerous crew aids and tools that the astronauts will use during their five planned spacewalks also will be integrated onto the carriers. The new hardware will ensure Hubble is at the apex of its scientific capability and that it functions efficiently for a minimum of five more years.

The processing and integration of the Hubble flight hardware will take approximately two months. The payload is scheduled to go to Launch Pad 39A in mid-September to be installed into Atlantis' payload bay.

Atlantis is targeted to launch October 8 at 0134 EDT.

FMI: www.nasa.gov/hubble

Advertisement

More News

ANN's Daily Aero-Term (05.01.24): Say Altitude

Say Altitude Used by ATC to ascertain an aircraft's specific altitude/flight level. When the aircraft is climbing or descending, the pilot should state the indicated altitude round>[...]

ANN's Daily Aero-Linx (05.01.24)

Aero Linx: European Air Law Association (EALA) EALA was established in 1988 with the aim to promote the study of European air law and to provide an open forum for those with an int>[...]

Classic Aero-TV: Korean War Hero Twice Reborn

From 2023 (YouTube Version): The Life, Death, Life, Death, and Life of a Glorious Warbird In 1981, business-owner Jim Tobul and his father purchased a Chance-Vought F4U Corsair. Mo>[...]

Airborne 04.29.24: EAA B-25 Rides, Textron 2024, G700 Deliveries

Also: USCG Retires MH-65 Dolphins, Irish Aviation Authority, NATCA Warns FAA, Diamond DA42 AD This summer, history enthusiasts will have a unique opportunity to experience World Wa>[...]

Airborne Affordable Flyers 05.02.24: Bobby Bailey, SPRG Report Cards, Skydive!

Also: WACO Kitchen Bails, French SportPlane Mfr to FL, Dynon-Advance Flight Systems, Innovation Preview Bobby Bailey, a bit of a fixture in sport aviation circles for his work with>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC