Boeing Mates Engines On 1st P-8A Poseidon | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Wed, Jul 02, 2008

Boeing Mates Engines On 1st P-8A Poseidon

737-Based Naval Test Aircraft To Be Delivered In 2009

Boeing tells ANN the company installed two CFM56-7B engines on the US Navy's first P-8A Poseidon June 21 in Renton, WA. The on-schedule assembly comes shortly after the aircraft's wing-to-body mate and "power on" milestones.

Following final functional checks, the Boeing-led Poseidon industry team will conduct initial engine runs. Boeing will deliver the first test aircraft to the Navy in 2009.

Engine installation is the culmination of efforts by Boeing and partner CFM International to leverage Lean practices from commercial industry to maximize efficiency. Boeing Integrated Defense Systems (IDS) and Boeing Commercial Airplanes (BCA) are working together to build the P-8A, a military derivative of the 737-800, on a new final assembly line. The factory's third line takes advantage of the manufacturing processes and performance of the highly reliable Next-Generation 737.

The CFM engines, with 27,300 pounds of thrust, have industry-leading dispatch reliability in excess of 99.99 percent. CFM delivered the engines to Boeing in early May.

The Navy plans to purchase 108 P-8As to replace its fleet of P-3C aircraft. Initial operational capability is slated for 2013. The P-8A will provide increased capability in long-range anti-submarine warfare, anti-surface warfare, intelligence, surveillance and reconnaissance

FMI: www.boeing.com/ids

Advertisement

More News

ANN's Daily Aero-Term (05.05.24): Omnidirectional Approach Lighting System

Omnidirectional Approach Lighting System ODALS consists of seven omnidirectional flashing lights located in the approach area of a nonprecision runway. Five lights are located on t>[...]

Aero-News: Quote of the Day (05.05.24)

"Polaris Dawn, the first of the program’s three human spaceflight missions, is targeted to launch to orbit no earlier than summer 2024. During the five-day mission, the crew >[...]

Airborne 05.06.24: Gone West-Dick Rutan, ICON BK Update, SpaceX EVA Suit

Also: 1800th E-Jet, Uncle Sam Sues For Landing Gear, Embraer Ag Plane, Textron Parts A friend of the family reported that Lt. Col. (Ret.) Richard Glenn Rutan flew west on Friday, M>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Aero-News: Quote of the Day (05.06xx.24)

“Our aircrews are trained and capable of rapidly shifting from operational missions to humanitarian roles. We planned to demonstrate how we, and our BORSTAR partners, respond>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC