New CSeries Aircraft Wing Factory Taking Shape In Belfast | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-Unlimited-04.23.24

Airborne-Unlimited-04.24.24 Airborne-FltTraining-04.25.24

Airborne-Unlimited-04.26.24

Mon, May 23, 2011

New CSeries Aircraft Wing Factory Taking Shape In Belfast

Installation Of Assembly Jigs Latest Milestone To Be Reached

Bombardier has begun installing semi-automated jigs at its new wing facility in Belfast, Northern Ireland, to support assembly of the advanced composite wings for the all-new CSeries aircraft. The jigs, fixed machinery that will be used to assemble the primary structural components of the composite wing torque box, are being installed in the second phase of a new, state-of-the-art 600,000 sq. ft. manufacturing and assembly facility. The first phase of the new factory, which will accommodate the fabrication of the composite components, was completed on schedule towards the end of 2010.

Bombardier's Belfast operation is responsible for the design, manufacture and integration of the advanced composite wings for the CS100 and CS300 jets, including all flight control surfaces and high-lift systems. The primary structural components of the wings will be produced using the unique Resin Transfer Infusion (RTI) process that has been developed by Bombardier Aerospace, Belfast engineers.

"The installation of the wing assembly jigs is another milestone that brings us a step closer to producing wings for the CSeries aircraft program," said Michael Ryan, Vice President and General Manager, Bombardier Aerospace, Belfast. "The jigs are highly automated and will allow us to control the assembly of the wings with a high degree of precision. We already installed a specially designed assembly jig to produce a pre-production wing technology demonstrator, and are now applying what we have learned from this to the actual production assembly jigs. We are confident that, working with our suppliers, we have implemented a tooling process that meets our high production standards," he said.

Last summer, Bombardier successfully completed the ultimate load test on the CSeries aircraft composite pre-production wing, replicating 150 per cent of the most severe forces the wing is ever likely to experience in service. The pre-production wing is part of the overall complex research and development program that Bombardier has undertaken to 'prove out' the new technology, manufacturing and assembly processes it is applying to the composite wing.

Meanwhile, all production equipment has been installed in the fabrication section of the new wing facility, which comprises a production area and low contamination 'clean room' area. Equipment installed includes a fabric cutter, a multiple-axis machine cell, pre-formers, an autoclave and non-destructive testing equipment. Production of the CSeries aircraft advanced composite wings is due to begin later this year.

FMI: www.bombardier.com

 


Advertisement

More News

ANN's Daily Aero-Term (04.30.24): Runway Centerline Lighting

Runway Centerline Lighting Flush centerline lights spaced at 50-foot intervals beginning 75 feet from the landing threshold and extending to within 75 feet of the opposite end of t>[...]

ANN's Daily Aero-Linx (04.30.24)

Aero Linx: Air Force Global Strike Command Air Force Global Strike Command, activated August 7, 2009, is a major command with headquarters at Barksdale Air Force Base, Louisiana, i>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne 04.29.24: EAA B-25 Rides, Textron 2024, G700 Deliveries

Also: USCG Retires MH-65 Dolphins, Irish Aviation Authority, NATCA Warns FAA, Diamond DA42 AD This summer, history enthusiasts will have a unique opportunity to experience World Wa>[...]

Airborne-NextGen 04.23.24: UAVOS UVH 170, magni650 Engine, World eVTOL Directory

Also: Moya Delivery Drone, USMC Drone Pilot, Inversion RAY Reentry Vehicle, RapidFlight UAVOS has recently achieved a significant milestone in public safety and emergency services >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC