DOT OIG Audit Of NextGen Equipage Rates Initiated | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Wed, May 23, 2018

DOT OIG Audit Of NextGen Equipage Rates Initiated

Requested By The Chairmen Of The House Committee On Transportation And Infrastructure And Its Aviation Subcommittee

Implementing the Next Generation Air Transportation System (NextGen) is a complex undertaking and requires joint investments from the Federal Aviation Administration (FAA) and airspace users to realize expected benefits. There are several key NextGen technologies that require airspace users to purchase and install new avionics on their aircraft, including the Automatic Dependent Surveillance–Broadcast (ADS B).

Citing concerns about whether operators will meet the 2020 deadline, the Chairmen of the House Committee on Transportation and Infrastructure and its Aviation Subcommittee requested that the OIG provide information regarding equipage rates for ADS-B and other NextGen technologies on air carrier and general aviation aircraft as well as the reasons operators decide to equip their aircraft. In addition, they requested that the OIG assess plans in place for meeting the 2020 ADS-B Out deadline.

The FAA has mandated that aircraft operating in most controlled domestic airspace be equipped with ADS-B Out technology by January 1, 2020. The audit objectives are to: (1) determine the equipage rates for ADS-B and other NextGen-enabling technologies on commercial and general aviation aircraft; (2) ascertain the reasons behind aircraft operators’ decisions to equip or not equip with these technologies; and (3) assess FAA and aircraft operators’ plans to meet the 2020 ADS-B Out equipage deadline.

The OIG plans to begin its audit in June. Work will be conducted at FAA Headquarters and other locations as necessary.

(Source: DOT OIG)

FMI: www.oig.dot.gov/sites/default/files/Audit%20Announcement%20-%20NextGen%20Equipage%20Rates%205-17-18.pdf

Advertisement

More News

ANN's Daily Aero-Term (05.07.24): Hazardous Weather Information

Hazardous Weather Information Summary of significant meteorological information (SIGMET/WS), convective significant meteorological information (convective SIGMET/WST), urgent pilot>[...]

ANN's Daily Aero-Linx (05.07.24)

Aero Linx: The T-6 Racing Association The T-6 Racing Association is all about T-6‘s and racing. Our mission is to bring great racing to our fans in Reno and other venues wher>[...]

Airborne 05.01.24: WACO Kitchen, FAA Reauthorization, World Skydiving Day

Also: Electra Aero, AMO-CBP v Smugglers, Naval King Airs, Boeing Deal To the surprise of everyone involved, Waco Kitchen shut down both airport operations with little warning and h>[...]

Airborne Affordable Flyers 05.02.24: Bobby Bailey, SPRG Report Cards, Skydive!

Also: WACO Kitchen Bails, French SportPlane Mfr to FL, Dynon-Advance Flight Systems, Innovation Preview Bobby Bailey, a bit of a fixture in sport aviation circles for his work with>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC