Flight Design Issues Service Bulletin For CTSL | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Mon, Dec 02, 2019

Flight Design Issues Service Bulletin For CTSL

Covers Installation Of Starter Solenoid With Large SLA Battery

Flight Design has issued a service bulletin covering the installation of the starter solenoid on many CT and CTLS models. According to the document, some CTLS are equipped with a larger sealed lead acid battery, which requires a different location of the starter solenoid. Under certain unfavorable combination of tolerances, contact of the starter solenoid may contact the throttle cable housing, which in return gets worn through over time. An unprotected electric short circuit may be the result.

The bulletin estimates that inspecting the solenoid installation should take about 10 minutes, while corrective action, if required, would take about two hours to complete. Both the inspection and correction must be done by an A&P Mechanic,LSA Repairman, Owner/Operator with Sport Pilot certification or higher, Part 145 Repair Station, Flight Design Service Center.

Conduct of this SB must be logged in the aircraft documentation by A&P Mechanic, LSA Repairman, Owner/Operator with Sport Pilot certification or higher, Part 145 Repair Station, or a Flight Design Service Center to return the airplane to service.

To inspect the solenoid installation:

  • Open the cowling
  • Identify the throttle cable housing of the right carburetor
  • Identify the starter solenoid
  • Determine the distance between Bowden wire and contacts of the solenoid
  • Distance should be at least 15mm-1/2 inch (a finger should fit in between)

Corrective procedure:

  • Disconnect battery
  • Detach solenoid from firewall
  • Turn solenoid by 180 degrees (need to detach starter wiring temporarily)
  • If needed prepare an adaptor plate to relocate the solenoid for correct distance to throttle cable housing.
  • Properly attach solenoid and starter wiring.
  • Reconnect battery.
  • Close cowling.

(Image from Flight Design news release)

FMI: Service Bulletin

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC