DOT OIG Initiates Audit Of The FAA's Pilot Training Requirements | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Thu, Feb 13, 2020

DOT OIG Initiates Audit Of The FAA's Pilot Training Requirements

Requested By Congress Following Boeing 737 MAX Accidents

On October 29, 2018, Lion Air Flight 610 crashed shortly after departing Jakarta, Indonesia, resulting in 189 fatalities. Five months later, on March 10, 2019, Ethiopian Air Flight 302 crashed shortly after departing Addis Ababa, Ethiopia, resulting in 157 fatalities, including 8 Americans. Both flights involved the Boeing 737 MAX 8 aircraft, which was certified by the FAA in March 2017.

These fatal accidents have drawn widespread attention to FAA’s oversight and certification practices, including the Agency’s process for establishing pilot training requirements for the aircraft. For example, at the time of the October 2018 accident, pilots were reportedly unaware of the new automation system—known as the Maneuvering Characteristics Augmentation System (MCAS)—that Boeing included on the MAX aircraft to improve aircraft performance. According to the Lion Air accident report, the pilots’ responses to erroneous activations of MCAS contributed to the crash, raising international concerns about the role of pilot training.

In light of these concerns, the Chairmen and the Ranking Members of the House Committee on Transportation and Infrastructure and its Subcommittee on Aviation requested that we review domestic and international pilot training standards related to commercial passenger aircraft, including the use of automation. Accordingly, our audit objectives will be to (1) evaluate FAA’s process for establishing pilot training requirements for U.S. and foreign air carriers operating U.S.-certificated large passenger aircraft, and (2) review international civil aviation authorities’ requirements for air carrier pilot training regarding the use of flight deck automation.

(Source: DOT OIG)

FMI: www.oig.dot.gov

Advertisement

More News

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Airborne 05.06.24: Gone West-Dick Rutan, ICON BK Update, SpaceX EVA Suit

Also: 1800th E-Jet, Uncle Sam Sues For Landing Gear, Embraer Ag Plane, Textron Parts A friend of the family reported that Lt. Col. (Ret.) Richard Glenn Rutan flew west on Friday, M>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC