Orion’s First Launch Attempt Beset By Multiple, Annoying Issues | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.14.24

Airborne-Unlimited-05.15.24 Airborne-AffordableFlyers-05.16.24

Airborne-Unlimited-05.17.24

Fri, Dec 05, 2014

Orion’s First Launch Attempt Beset By Multiple, Annoying Issues

Trespassing Boats, Gusty Winds and Recalcitrant Valves… Oh My!

BY ANN Space Correspondent, Wes Oleszewski -- From The Cape

With crowds resembling those that gathered at the Kennedy Space Center for high-profile Shuttle Launches lining the roads and shoreline, the first Orion EFT launch attempt was scrubbed – but not without a lot of drama.

The first delay in the count came when a boat strayed into range safety’s restricted area.

Once the count resumed, the next hold was triggered by a gust of wind at the pad.

Reportedly, a mission rule that was programmed into the countdown computer was set to detect wind, blown from a given direction at a given velocity. Such wind is a hazard due to the wide cross-section of the launch vehicle. Once the countdown was recycled and started again, a second wind violation took place.

The process was repeated and restarted a third time when another wind violation took place. Upon that the launch directors elected to mask the wind limitation in the computer and make a manual judgment on the wind.
While the final wind decision was being made an issue was discovered with the Liquid Hydrogen (LH2) valve in the center CBC. As that valve was being exercised, and trouble shooting was taking place, a similar issue was detected in the port side CBC. These valves control the in-flow of the LH2 and once closed, are left in that position for the flight. Additionally, they can be used as a drain for the LH2. Each is a ball-valve that is more than 10 inches in diameter and located at the base of each CBC.

The count was recycled but the launch team decided to scrub the launch for the day as the launch window was about to close and no positive fix was found.

As of this writing a second attempt at launching the EFT-1 will take place Friday morning at 7:05 a.m. Eastern time. If, however, a 48 hour delay is required a Saturday Lunch will be attempted also at 7:05 a.m.

FMI: www.nasa.gov

 


Advertisement

More News

Classic Aero-TV: Remembering Bob Hoover

From 2023 (YouTube Version): Legacy of a Titan Robert (Bob) Anderson Hoover was a fighter pilot, test pilot, flight instructor, and air show superstar. More so, Bob Hoover was an i>[...]

ANN FAQ: Follow Us On Instagram!

Get The Latest in Aviation News NOW on Instagram Are you on Instagram yet? It's been around for a few years, quietly picking up traction mostly thanks to everybody's new obsession >[...]

ANN's Daily Aero-Linx (05.15.24)

Aero Linx: B-52H Stratofortress The B-52H Stratofortress is a long-range, heavy bomber that can perform a variety of missions. The bomber is capable of flying at high subsonic spee>[...]

ANN's Daily Aero-Term (05.15.24):Altimeter Setting

Altimeter Setting The barometric pressure reading used to adjust a pressure altimeter for variations in existing atmospheric pressure or to the standard altimeter setting (29.92).>[...]

Aero-News: Quote of the Day (05.16.24)

"Knowing that we play an active part in bettering people's lives is extremely rewarding. My team and I are very thankful for the opportunity to be here and to help in any way we ca>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC