FAA Issues Emergency AD For Some Pratt & Whitney Canada Engines | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.14.24

Airborne-Unlimited-05.15.24 Airborne-AffordableFlyers-05.16.24

Airborne-Unlimited-05.17.24

Fri, Sep 16, 2011

FAA Issues Emergency AD For Some Pratt & Whitney Canada Engines

Issues Found With Certain First Stage Reduction Sun Gears

The FAA has sent a notice of an emergency AD (2011-20-51) to owners and operators of Pratt & Whitney Canada PT6A-15AG, -27, -28, -34, -34AG, -34B, and -36 series turboprop engines.

The move was prompted by failures of certain first stage reduction sun gears, manufactured by Timken Alcor Aerospace Technologies, Inc. These gears are manufactured under a part manufacturer approval (PMA) as replacement parts for installation in propeller reduction gearbox assemblies of Pratt & Whitney Canada PT6A-15AG, -27, -28, -34, -34AG, -34B, and -36 series turboprop engines. About 80 of these sun gears are suspect for having a manufacturing anomaly. About half of the suspect sun gears have already been taken out of service. This condition, if not corrected, could result in failure of the shaft portion of the sun gear, which will result in an engine in-flight shut down, possible uncontained engine failure, aircraft damage, and serious injuries.

The AD was issued after the FAA evaluated of all the relevant information, and determined the unsafe condition described previously is likely to exist or develop in other products of the same type design. The FAA has found that the risk to the flying public justifies issuing this AD on an emergency basis.

The AD requires the removal of affected PMA replacement Timken Alcor Aerospace Technologies, Inc. first stage reduction sun gear and the interacting planet gears, from the propeller reduction gearbox assembly, within 15 operating hours or 15 days after receipt of this AD, whichever occurs first.

FMI: http://rgl.faa.gov/Regulatory_and_Guidance_Library/rgAD.nsf/0/994D43AAE16A4BF68625790C005F46A7?OpenDocument

Advertisement

More News

Bolen Gives Congress a Rare Thumbs-Up

Aviation Governance Secured...At Least For a While The National Business Aviation Association similarly applauded the passage of the FAA's recent reauthorization, contentedly recou>[...]

The SportPlane Resource Guide RETURNS!!!!

Emphasis On Growing The Future of Aviation Through Concentration on 'AFFORDABLE FLYERS' It's been a number of years since the Latest Edition of Jim Campbell's HUGE SportPlane Resou>[...]

Buying Sprees Continue: Textron eAviation Takes On Amazilia Aerospace

Amazilia Aerospace GmbH, Develops Digital Flight Control, Flight Guidance And Vehicle Management Systems Textron eAviation has acquired substantially all the assets of Amazilia Aer>[...]

Hawker 4000 Bizjets Gain Nav System, Data Link STC

Honeywell's Primus Brings New Tools and Niceties for Hawker Operators Hawker 4000 business jet operators have a new installation on the table, now that the FAA has granted an STC f>[...]

Echodyne Gets BVLOS Waiver for AiRanger Aircraft

Company Celebrates Niche-but-Important Advancement in Industry Standards Echodyne has announced full integration of its proprietary 'EchoFlight' radar into the e American Aerospace>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC