AD: Safran Helicopter Engines | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Airborne Unlimited-
Monday

Airborne-Unmanned w/AUVSI-
Tuesday

Airborne Unlimited-
Wednesday

AMA Drone Report-
Thursday

Airborne Unlimited-
Friday

Airborne On ANN

Airborne Unlimited-08.13.18

Airborne Unmanned-08.14.18

Airborne Unlimited-08.15.18

AMA Drone Report-08.09.18

Airborne Unlimited-08.10.18

Airborne-YouTube

Airborne Unlimited-08.13.18

Airborne Unmanned-08.14.18

Airborne Unlimited-08.15.18

AMA Drone Report-08.09.18

Airborne Unlimited-08.10.18

It's ALIVE!!! The 2018 AirVenture Innovation Preview is Viewable RIGHT NOW at www.oshcast.com or www.oshcast.net!

Fri, Aug 10, 2018

AD: Safran Helicopter Engines

AD NUMBER: 2018-12-01

PRODUCT: All Safran Helicopter Engines, S.A., Arriel 2B and 2B1 turboshaft engines.

ACTION: Final Rule.

SUMMARY:  The FAA is superseding Airworthiness Directive (AD) 2012-03-11, which applied to the products listed above.

AD 2012-03-11 required checking the transmissible torque between the low-pressure (LP) pump impeller and the high-pressure (HP) pump shaft on the HP/LP pump and metering valve assembly, hereafter referred to as the hydromechanical metering unit (HMU).

Since AD 2012-03-11 was issued, the manufacturer determined that incorporating Modification TU 178 is a more effective method to reduce the risk of uncoupling between the LP fuel pump impeller and the HP fuel pump shaft than the prior Modification TU 147.

This AD requires inspection and possible replacement of the HMU. This AD was prompted by three cases of uncoupling of the HMU LP fuel pump impeller and the HP fuel pump shaft since AD 2012- 03-11 was issued.

DATES: This AD is effective September 12, 2018.

COST: The FAA estimates that this AD affects 417 engines installed on helicopters of U.S. registry. The cost of compliance is estimated as follows:

  • Remove and replace the HP/LP fuel pump metering unit. Labor - 2 work-hours × $85 per hour = $170; Parts - $17,400; Cost per aircraft - $17,570.
FMI: AD

Advertisement

More News

AMA Drone Report 08.09.18: UK Kid/Drone Ban?, FAI Int'l, UAV 'Attack' Fallout?

Also: FAA: NO Drones Near Wildfires, Solar-Powered Record, Louisiana UAVs, Drone Center Of Excellence The U.K. has new drone rules under consideration that would ban people under 1>[...]

Airborne-Unmanned 08.07.18: Pipistrel OPV/UAVs, Drone Med Supply, ParaZero Save

Also: Aurora Flight Sciences, Advanced sUAS Inspection, GA-ASI Selected, Drone Center Of Excellence The aviation and aerospace is constantly abuzz with details about the latest gen>[...]

It's ALIVE! 2018 AirVenture Innovation Preview Program Now Available

Get The Inside Details On THE Most Exciting NEW Innovations And Product Announcements From OSHKOSH 2018... The staff of EAA and the Aero-News Network were pleased to release the la>[...]

Airborne 08.13.18: Bizarre Q400 Theft, Female Hurricane Hunters, One Week Wonder

Also: Colorado Reservists, Flight Examiner Bribe Attempt, Boeing 737 Logjam, World Helicopter Day An airport worker, first identified as a mechanic, and then as a ramp agent, appar>[...]

Airborne 08.10.18: ANN Flies Sling TSi, Indoor Skydivers, Bob Hoover Artistry

Also: 2Q-18 Avionics Sales, HondaJet Elite Deliveries, Pilot Sentenced, Drone Herds Birds The day after Oshkosh 2018 came to a close, ANN’s Jim Campbell had the chance to be >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2018 Web Development & Design by Pauli Systems, LC