FAA Issues New 51% Guidance | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Thu, Dec 29, 2011

FAA Issues New 51% Guidance

Resolves Vague Use Of Generic Checklists By Builders

The FAA put amateur builders into a state of regulatory limbo starting in 2008, when it announced it was rewriting its guidelines for inspectors evaluating new builds for compliance with its "Major Portion Requirement," better known informally as "The 51% Rule." New rules for homebuilt airplanes followed fairly quickly (by FAA standards), but inspectors evaluating rotorcraft, weight-shift aircraft and powered parachutes were instructed to use the old, vague, generic fabrication and assembly task checklist for these classes until new checklists were created for them, too.

 

That created a huge grey area, and resulted in a gamble for builders going before their individual inspectors and FSDOs. The choices were to either build from a kit grandfathered on the FAA's old 51% List, or hope you didn't spend years and thousands of dollars building an aircraft which would be denied an airworthiness certificate based on a local interpretation.

That vagueness appears to finally be resolved. Tom Milton, a PRA Director and FAA Designated Airworthiness Inspector, announced today that the FAA has issued new guidelines to inspectors which are to be used to evaluate whether new amateur-built rotorcraft being submitted for inspection meet the requirement that a major portion of fabrication and assemble tasks have been performed by amateurs. (Also known as "The 51% Rule.")

Milton, posting on a rotorcraft forum says, in part: "It looks like the long awaited gyro checklist has arrived without a wimper. Greg Gremminger, myself and others...were asked to make a prototype checklist for gyros and we did. I believe we left off some time ago with the hint that it might be approved by October 2011. It looks like it has been approved..."

Regarding the uncertainty which has plagued builders about local interpretation, Milton suggests, "this is a nearly bullet proof method of assuring 51% compliance. The checklist, along with pictures and dates would be hard to top for a Builder's Log."

The FAA's new checklist document were posted October 21, but apparently, the FAA did not notify DARs at the time. They will be expected to begin using the new checklist immediately, which means builders will need to use it, too, to make sure they qualify for an EAB airworthiness certificate.
 
Find the FAA document using the FMI link below, and scroll to the bottom to find links to the new checklists for Helicopters, Gyrocopters (sic), Weight Shift and Powered Parachute, in downloadable PDF form.

FMI: www.faa.gov/aircraft/gen_av/ultralights/amateur_built/kits/

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC