NASA Assessing New Launch Dates For The Glory Mission | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Sun, Feb 27, 2011

NASA Assessing New Launch Dates For The Glory Mission

Problem Seems To Be Coming From The Vehicle Interface Control Console

Preparations for the launch of NASA's Glory mission from Vandenberg Air Force Base in California have been suspended temporarily. Engineers continue to troubleshoot a malfunction in ground support equipment associated with the Taurus XL rocket.

On Feb. 23, a false indication was received about the rocket's status after commands were sent approximately 15 minutes before launch to activate the Taurus. "We had an indication that a 'hold-fire' command was sent when indeed it had not," said Omar Baez, NASA launch director.

The commands originated from the Vehicle Interface Control Console in the mobile launch support van stationed a few miles from the launch pad. The problem has not yet been isolated, and troubleshooting continues. Managers are evaluating possible Glory launch opportunities in early to mid-March.

"The Glory spacecraft is doing fine," reported Bryan Fafaul, Glory project manager from NASA's Goddard Space Flight in Greenbelt, MD. "We are continuing to slow charge the battery until we have a new launch date."

The Glory satellite will be launched aboard a Taurus on a mission to improve our understanding of how the sun and tiny atmospheric particles called aerosols affect Earth's climate. Glory launch management is provided by NASA's Launch Service Program at the agency's Kennedy Space Center in Florida. Orbital Sciences Corp. is providing the Taurus XL launch vehicle and is responsible for spacecraft operations.

FMI: www.nasa.gov/glory

Advertisement

More News

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Term (05.06.24): Altitude Readout

Altitude Readout An aircraft’s altitude, transmitted via the Mode C transponder feature, that is visually displayed in 100-foot increments on a radar scope having readout cap>[...]

ANN's Daily Aero-Linx (05.06.24)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC