NASA Pushes Discovery Launch To Late May | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Thu, Feb 21, 2008

NASA Pushes Discovery Launch To Late May

STS-124 Targeted For Nighttime Liftoff

With the shuttle Atlantis back home safe, and Endeavour ready at the launch pad for launch early month, on Wednesday NASA announced it is now targeting May 25 at 1926 EDT for the launch of the space shuttle Discovery's STS-124 mission from the Kennedy Space Center in Florida -- over one month later than originally planned.

As ANN reported, NASA announced last week it had rescheduled the last three shuttle missions for 2008, and it would hold off determining dates for the next two launches until Atlantis had returned.

Discovery's flight was originally targeted for April 24. However, fuel sensor system repair work on STS-122 and STS-123 delayed final preparations of Discovery's external fuel tank, and the tank is not expected to arrive at Kennedy until early March.

Furthermore, the shuttle can't launch to the International Space Station between May 7 and 25 because the angle of the sun with respect to the plane of the station's orbit is too high to generate sufficient solar power for the mission.

The space agency stressed the delay to Discovery's launch date will not affect the remainder of the shuttle manifest, which is pushing against a hard September 30, 2010 retirement deadline.

Shuttle and station program officials will continue to evaluate Discovery's liftoff date and are protecting the option to launch the shuttle a few days earlier.

During the mission to the space station, the shuttle and its seven-member crew will deliver the pressurized module and the robotic arm of the Japan Aerospace Exploration Agency's Kibo laboratory.

FMI: www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts124

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC