Five Years Of Columbus In Space | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Thu, Mar 28, 2013

Five Years Of Columbus In Space

Astrium Celebrates Space Laboratory Anniversary And Promising Future Prospects

European space company Astrium is opening a new chapter in European space flight. On the occasion of the celebrations to mark five successful years of service by the Columbus space laboratory on Wednesday, Astrium underscored its key industrial role in shaping the future of European space flight in the presence of Peter Hintze, Parliamentary State Secretary and Federal Government Coordinator of German Aerospace Policy, Jean-Jacques Dordain, Director General of the European Space Agency (ESA), Dr. Thomas Reiter, ESA’s Director of Human Spaceflight and Operations, and Jens Böhrnsen, President of the Senate of the Free Hanseatic City of Bremen.

Underpinned by the unique know-how gained from Columbus and ATV (Automated Transfer Vehicle, the European space cargo vehicle) operations, Europe will gain a whole new level of access to space thanks to the service module for the new American MPCV/Orion spacecraft, along with the further development of Ariane 5 ME and possibly Ariane 6 – with Astrium at the forefront. The ESA Council Meeting at Ministerial level in November 2012 delivered the decisive impetus setting European space travel on this exciting course.

The European space laboratory Columbus, which was built in Bremen (Germany), has been part of the International Space Station for five years and has provided a reliable research environment for more than 200 scientific experiments. “Columbus is the flagship of European scientific engineering and a key contribution of ESA Members States to the ISS success story”, said Jean-Jacques Dordain, Director General of the European Space Agency (ESA).

Columbus will be in service until at least 2020. Alongside the Automated Transfer Vehicle (ATV) supply spaceship, Columbus is the latest illustration of Astrium’s know-how in the field of human spaceflight. The next challenge will be the provision of the MPCV-ESM (Multi-Purpose Crew Vehicle – European Service Module) based on capabilities developed at Astrium for Spacelab, EURECA, Columbus and ATV.

In addition to the MPCV service module, there will be a strong focus on further developing the Ariane family. Following the ESA Ministerial Council decisions in November 2012, ESA awarded Astrium contracts worth 108 million euros in January 2013 as prime contractor for developing the Ariane 5 ME and Ariane 6 launch vehicles. “We are delighted about this positive development at the European level,” said François Auque, CEO of Astrium. “For Astrium, and specifically our Bremen location, where development and production of the upper stages of the Ariane family is based, the main significance of these contracts resides in the jobs they will secure and create.”

There was a lot at stake at the 2012 Ministerial Council meeting. “This makes us all the more pleased that ESA, in spite of a challenging economic and financial environment, made decisions for the future that will enable Germany, – and thus Astrium too – to put its development expertise to work for the benefit of Europe,” said Peter Hintze, Parliamentary State Secretary and Federal Government Coordinator of German Aerospace Policy. “The decision to continue the development of Ariane 5 ME with the new upper stage was important. There was a lot riding on that decision, particularly for the Bremen location with its upper stage expertise.” The launch of the first Ariane 5 ME is planned for 2017, or 2018 at the latest. In addition, a study to clarify unresolved issues around the successor launch system, Ariane 6, will be completed by mid-2013.

FMI: www.astrium.com

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC