Bell V-280 Valor Selected For Army’s JMR-TD Program | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Thu, Jun 06, 2013

Bell V-280 Valor Selected For Army’s JMR-TD Program

To Be Considered For Future Vertical Lift Program

The U.S. Army has selected Bell Helicopter's V-280 Valor, its third generation tiltrotor design, for the Joint Multi-Role (JMR) Technology Demonstrator (TD) program. The Army is expected to award JMR-TD contracts by September 2013, with first flight scheduled for 2017.

"The Bell V-280 Valor will provide the Army’s most sought-after capability with a cruise speed of 280 knots,” said Keith Flail, director of Bell Helicopter’s Future Vertical Lift program. "We have also focused technology advancements on providing outstanding low-speed agility, high-hot (6K/95F) hover capability, multiple-g high-speed maneuverability, superior fuel efficiency and radically improved range capabilities while improving reliability and reducing costs.”

Bell says the V-280 Valor is designed to offer the U.S. Army the highest levels of maturity and technical readiness. The company says the Valor will have the capacity to perform a multitude of missions with unparalleled speed and agility. The Bell V-280's clean sheet design reduces complexity compared to previous generation tiltrotors, with fewer parts. The Valor is designed to deliver the best value in procurement, operations and support, and force structure, providing increased maintainability, component reliability and systems designed to reduce operational and support costs, according to a news release.

After reviewing several JMR-TD proposals from various manufacturers, the U.S. Army evaluation team classified Bell Helicopter’s offering as a Category I proposal. According to the U.S. Army’s Contracting Division, a Category I proposal is a “well conceived, scientifically or technically sound proposal pertinent to program goals and objectives with applicability to Army mission needs, and offered by a responsible contractor with the competent scientific and technical staff supporting resources needed to ensure satisfactory program results. Proposals (or portions thereof) in Category I are recommended for acceptance and funding is available.”

The JMR-TD program is the science and technology precursor to the Department of Defense’s estimated $100 billion Future Vertical Lift program expected to replace between 2000-4000 medium class utility and attack helicopters. The U.S. Army and Department of Defense are seeking leap-ahead capabilities and have identified a speed of 230+ knots as a key discriminating capability. Its current fleet cruises at 130 knots.

(Image provided by Bell Helicopter)

FMI www.bellhelicopter.com

Advertisement

More News

ANN's Daily Aero-Term (05.07.24): Hazardous Weather Information

Hazardous Weather Information Summary of significant meteorological information (SIGMET/WS), convective significant meteorological information (convective SIGMET/WST), urgent pilot>[...]

ANN's Daily Aero-Linx (05.07.24)

Aero Linx: The T-6 Racing Association The T-6 Racing Association is all about T-6‘s and racing. Our mission is to bring great racing to our fans in Reno and other venues wher>[...]

Airborne 05.01.24: WACO Kitchen, FAA Reauthorization, World Skydiving Day

Also: Electra Aero, AMO-CBP v Smugglers, Naval King Airs, Boeing Deal To the surprise of everyone involved, Waco Kitchen shut down both airport operations with little warning and h>[...]

Airborne Affordable Flyers 05.02.24: Bobby Bailey, SPRG Report Cards, Skydive!

Also: WACO Kitchen Bails, French SportPlane Mfr to FL, Dynon-Advance Flight Systems, Innovation Preview Bobby Bailey, a bit of a fixture in sport aviation circles for his work with>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC