Wed, May 27, 2015
Comment Period On NPRM Closes Thursday
The FAA has proposed the elimination of 736 VOR and NDB approaches nationwide as it transitions to the NextGen air traffic control system.
An NPRM posted in April identifies the procedures have been identified for cancellation.
On June 27, 2014, the FAA published a policy establishing criteria for cancelling instrument approach procedures (79 FR 36576). Cancelling certain ground-based non-directional beacon (NDB), and very high frequency (VHF), omnidirectional radio range (VOR) SIAPs is one integral part of right-sizing the quantity and type of procedures in the National Airspace System (NAS). As new technology facilitates the introduction of area navigation (RNAV) instrument approach procedures, the number of procedures available in the National Airspace System has nearly doubled over the past decade. The complexity and cost to the FAA of maintaining the existing ground based navigational infrastructure while expanding the new RNAV capability is not sustainable. Therefore, the FAA is proposing the following list of SIAPs for cancellation based on the criteria established in the Policy.
The FAA has determined that this proposed regulation only involves an established body of technical regulations for which frequent and routine amendments are necessary to keep them operationally current. It, therefore—(1) is not a “significant regulatory action” under Executive Order 12866; (2) is not a “significant rule” under DOT Regulatory Policies and Procedures (44 FR 11034; February 26, 1979) and (3) does not warrant preparation of a regulatory evaluation as the anticipated impact is so minimal. For the same reason, the FAA certifies that this amendment will not have a significant economic impact on a substantial number of small entities under the criteria of the Regulatory Flexibility Act.
The proposed list can be found here. Comments of the NPRM will be accepted until May 28th.
More News
Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]
A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]
Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]
Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]
From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]