Fourth G650 Now In Flight Test Program | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Tue, Jun 22, 2010

Fourth G650 Now In Flight Test Program

First Production Aircraft To Begin Testing

A fourth aircraft is now part of the Gulfstream G650 flight-test program, Gulfstream Aerospace announced Monday. The newest test aircraft flew for the first time June 6 and has spent more than five hours in the air.

Unlike its three predecessors, the fourth G650 (S/N 6004) is a production aircraft. S/N 6004 will be the first G650 outfitted and tested with a full interior, which will be installed later this summer. The aircraft, which will be used to evaluate the aircraft's cabin systems, is expected to resume flight testing following the installation.


File Photo

The G650 flight-test program involves an estimated 1,800 hours of flight and a specific purpose for each of five aircraft. S/N 6001 is focused on envelope expansion, air data calibration, flutter, in-flight performance and flight controls. S/N 6002 is used to evaluate the aircraft's systems, while S/N 6003 tests the avionics, in-flight load measurement and ice protection system. S/N 6005, which has been turned over to the Flight Test department for outfitting, will participate in the reduced vertical separation minimum testing.

The G650 flight-test program officially began on Nov. 25, 2009. Through June 20, the four aircraft currently in the program have completed more than 85 flights and 240 flight-test hours.

Ultimate load testing of the aircraft's primary structural components has also begun. In April, the aircraft completed the structural limit load testing required by the FAA and the EASA. The limit load represents the maximum load the aircraft should experience during its life cycle. Ultimate load is 50 percent more than limit load. Ultimate load testing will be performed on the fuselage, wing, vertical and horizontal stabilizers, nose landing gear and all control surfaces.


File Photo

The G650 has also flown at its maximum takeoff weight of 99,600 pounds and recently reached its maximum operational Mach number of Mach 0.925 at 42,500 feet.

The aircraft is expected to receive certification from the FAA and EASA in 2011. It is on schedule to enter service in 2012.

FMI: www.gulfstream.com

Advertisement

More News

Airborne 04.16.24: RV Update, Affordable Flying Expo, Diamond Lil

Also: B-29 Superfortress Reunion, FAA Wants Controllers, Spirit Airlines Pulls Back, Gogo Galileo Van's Aircraft posted a short video recapping the goings-on around their reorganiz>[...]

ANN's Daily Aero-Term (04.20.24): Light Gun

Light Gun A handheld directional light signaling device which emits a brilliant narrow beam of white, green, or red light as selected by the tower controller. The color and type of>[...]

Aero-News: Quote of the Day (04.20.24)

"The journey to this achievement started nearly a decade ago when a freshly commissioned Gentry, driven by a fascination with new technologies and a desire to contribute significan>[...]

Aero-News: Quote of the Day (04.21.24)

"Our driven and innovative team of military and civilian Airmen delivers combat power daily, ensuring our nation is ready today and tomorrow." Source: General Duke Richardson, AFMC>[...]

ANN's Daily Aero-Term (04.21.24): Aircraft Conflict

Aircraft Conflict Predicted conflict, within EDST of two aircraft, or between aircraft and airspace. A Red alert is used for conflicts when the predicted minimum separation is 5 na>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC