SNC Completes Critical Dream Chaser Wind Tunnel Tests | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Wed, May 21, 2014

SNC Completes Critical Dream Chaser Wind Tunnel Tests

Passes NASA CCiCap Program Milestone

Sierra Nevada Corporation (SNC) says it has hit the latest milestone in its NASA Commercial Crew Integrated Capability (CCiCap) agreement. NASA awarded SNC full value of $20 million for the passage of CCiCap Milestone 8, Wind Tunnel Testing. To date, SNC has received over 80 percent of the total award value under the CCiCap agreement and is on track to complete the program later this year.

The purpose of Milestone 8 was to continue to advance the overall design of the Dream Chaser orbital spacecraft by analyzing the forces and flight dynamic characteristics that the vehicle will experience during orbital ascent and re-entry. The completion of this milestone significantly advances the path to orbital flight of the Dream Chaser spacecraft and the Dream Chaser Atlas V integrated launch system. Several Dream Chaser scale model spacecraft were subjected to multiple different wind tunnel tests in various configurations, including the integrated Dream Chaser attached to the United Launch Alliance Atlas V launch vehicle. In addition to the baseline milestone criteria, SNC fully self-funded an additional wind tunnel test that will accelerate the Dream Chaser development schedule and path to completion of the Critical Design Review.

“The aerodynamic data collected during these tests has further proven and validated Dream Chaser’s integrated spacecraft and launch vehicle system design. It also has shown that Dream Chaser expected performance is greater than initially predicted,” said Mark N. Sirangelo, corporate vice president and head of SNC’s Space Systems. “Our program continues to fully complete each of our CCiCap agreement milestones assisted through our strong collaboration efforts with our integrated ‘Dream Team’ of industry, university and government strategic partners. We are on schedule to launch our first orbital flight in November of 2016, which will mark the beginning of the restoration of U.S. crew capability to low-Earth orbit.”

The wind tunnel tests for this milestone were completed at NASA’s Ames Research Center in Moffett Field, California, CALSPAN Transonic Wind Tunnel in New York, and at NASA’s Langley Research Center Unitary Plan Wind Tunnel in Hampton, Virginia. SNC has a long standing relationship with Langley dating to 2004, the beginning of its development for the Dream Chaser, a derivative of NASA’s HL-20 lifting body vehicle. Langley also houses the full motion-based flight simulator, which operates using Dream Chaser flight software and has been used to train future Dream Chaser pilots and NASA astronauts. In addition to these locations, previous wind tunnel testing also occurred at NASA’s Marshall Space Flight Center in Huntsville, Alabama and at Texas A&M University.

SNC is working with NASA’s Commercial Crew Program to develop a safe, innovative, modern, flexible and highly-capable crew transportation system for the 21st Century. Dream Chaser provides the only reusable, human-rated lifting-body spacecraft with a commercial runway landing capability, anywhere in the world, and is on the forefront of the commercial human spaceflight industry, offering safe, reliable and cost-effective crew and critical cargo transportation to low-Earth orbit. Dream Chaser is a multi-mission capable spacecraft that has the ability to work as an independent science platform, or as a logistics vehicle to retrieve, repair, replace, assemble or deploy items in space.

(Image from file)

FMI: www.sncspace.com

Advertisement

More News

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Term (05.06.24): Altitude Readout

Altitude Readout An aircraft’s altitude, transmitted via the Mode C transponder feature, that is visually displayed in 100-foot increments on a radar scope having readout cap>[...]

ANN's Daily Aero-Linx (05.06.24)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC