Eclipse Test Fleet Passes 2,000 Flight Hours | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-Unlimited-04.23.24

Airborne-Unlimited-04.24.24 Airborne-FltTraining-04.25.24

Airborne-Unlimited-04.26.24

Wed, May 31, 2006

Eclipse Test Fleet Passes 2,000 Flight Hours

Six Customer Aircraft On Production Line

They can see certification on the horizon. That's the word from Eclipse Aviation, as the company announced Tuesday its Eclipse 500 test fleet has exceeded 2,000 flight hours, and has completed the majority of required FAA certification testing. The company also announced that six customer Eclipse 500 VLJs are in various assembly positions on the production line.

"Our test fleet of five Eclipse 500s continues to burn test points and build hours at a rapid rate. We accumulated more than 300 flight hours in the last four weeks," said Vern Raburn, president and CEO of Eclipse Aviation. "I am also thrilled to see the production line coming to life. Last weekend, the first customer Eclipse 500 forward fuselage was mated to the aft fuselage."

Sources with Eclipse tell ANN the company has made significant accomplishments in aircraft testing. Recent milestones include successful completion of:

  • All installed-engine operational certification tests, including engine operating characteristics, restarts, cooling and ventilation, engine exhaust influence on airframe temperature, vibration, negative-g and powerplant drainage
  • Unusable fuel and hot fuel certification tests
  • Cabin air smoke clearing certification tests
  • Flight test points and data collection in support of Part 36 noise certification
  • Climate control system certification ground testing
  • All fuel system certification ground tests

Eclipse's production line now has six aircraft in various assembly positions. P1 (above, below) recently completed fuselage mate and is in position seven awaiting wing mate. P2 (bottom) and P3 have been moved off the production tools and are in cabin build-up. The next three (P4, P5 and P6) production aircraft have completed friction stir welding and are in sub-assembly build-up.

As Aero-News reported in March, P1 will be delivered to customer David Crowe -- who had the honor of triggering some of the first friction-stir welding work on his airframe -- shortly after FAA certification.

Eclipse says the 500 is on track to achieve FAA certification by the end of this quarter -- just one month from today -- which should make the six-passenger jet the first VLJ to market. 

FMI: www.eclipseaviation.com

Advertisement

More News

ANN's Daily Aero-Term (04.26.24): DETRESFA (Distress Phrase)

DETRESFA (Distress Phrase) The code word used to designate an emergency phase wherein there is reasonable certainty that an aircraft and its occupants are threatened by grave and i>[...]

Aero-News: Quote of the Day (04.26.24)

"General aviation is at the forefront of developing and introducing innovative technologies that will transform the entire aviation industry..." Source: Kyle Martin, Vice President>[...]

ANN's Daily Aero-Term (04.27.24): Direct

Direct Straight line flight between two navigational aids, fixes, points, or any combination thereof. When used by pilots in describing off-airway routes, points defining direct ro>[...]

ANN's Daily Aero-Linx (04.27.24)

Aero Linx: Women in Corporate Aviation Women in Corporate Aviation support individuals seeking career advancement and professional development in the business aviation industry. Me>[...]

Aero-News: Quote of the Day (04.27.24)

“We would like to thank the many volunteers that help throughout the year to pull off the event, as well as the several reviewers, judges, and SURVICE staff that provide team>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC