NASA Continues Orion Parachute Testing For Future Test Flight | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.14.24

Airborne-Unlimited-05.15.24 Airborne-AffordableFlyers-05.16.24

Airborne-Unlimited-05.17.24

Thu, Apr 19, 2012

NASA Continues Orion Parachute Testing For Future Test Flight

Agency Targets 2014 For First Orion Test Flight

NASA successfully conducted a drop test of the Orion crew vehicle's entry, descent and landing parachutes high above the Arizona desert Tuesday in preparation for the vehicle's orbital flight test, Exploration Flight Test -1, in 2014.

A C-130 plane dropped a dart-shaped test vehicle with a simulated Orion parachute compartment from an altitude of 25,000 feet above the U.S. Army's Yuma Proving Grounds. Orion's drogue chutes were deployed at 20,000 feet, followed by the pilot parachutes, which then deployed the main landing parachutes. The test vehicle landed on the desert floor at a speed of almost 25 feet per second, well below the maximum designed touchdown speed of the spacecraft.

This particular drop test had two primary objectives. The first determined how the entire system would respond if one of the three main parachutes inflated too quickly, which occurs if a reefing stage, which helps the parachutes open gradually, is skipped. The second objective was to validate the drogue parachute design by testing at a high dynamic pressure that closely mimicked the environments expected for Exploration Flight Test-1. This test flight, scheduled for 2014, is designed to test a number of Orion's systems, including the avionics, navigation and thermal protection systems and will send Orion more than 3,000 miles into space.

Since 2007, the Orion program has conducted a vigorous parachute air and ground test program and provided the chutes for NASA's successful pad abort test in 2010. The tests improve understanding about the chutes' technical performance for eventual human-rated certification. The next parachute test will be conducted this summer. (Image provided by NASA)

FMI: www.nasa.gov/orion

Advertisement

More News

ANN's Daily Aero-Term (05.16.24): Instrument Runway

Instrument Runway A runway equipped with electronic and visual navigation aids for which a precision or nonprecision approach procedure having straight-in landing minimums has been>[...]

ANN's Daily Aero-Linx (05.16.24)

Aero Linx: Alaska Airmen's Association The Alaska Airmen's Association includes over 2,000 members—we are one of the largest General Aviation communities in the country. We s>[...]

Airborne 05.15.24: Ghost Sq MidAir, B-2 Junked, Dream Chaser Readies

Also: Flt School Security, G600 Steep-Approach, Honduran Aid, PW545D Cert Two aircraft performing at the Fort Lauderdale Air Show clipped wings during a routine last Sunday, spooki>[...]

Airborne 05.10.24: Icon Auction, Drunk MedEvac Pilot, Bell ALFA

Also: SkyReach Parts Support, Piper Service Ctr, Airliner Near-Miss, Airshow London The Judge overseeing Icon's convoluted Chapter 11 process has approved $9 million in Chapter 11 >[...]

Airborne Affordable Flyers 05.16.24: PRA Runway, Wag-Aero Sold, Young Eagles

Also: Paramotor Champ's, Electric Ultralight, ICON BK Update, Burt Rutan at Oshkosh! The Popular Rotorcraft Association is reaching out for help in rebuilding their private runway >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC