Assembly Of 2nd KC-46A Tanker Aircraft Underway | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Sat, Aug 24, 2013

Assembly Of 2nd KC-46A Tanker Aircraft Underway

Four Test Aircraft Expected To Be Completed By July 2014

Assembly of the second KC-46A Tanker got underway this week as workers loaded the aircraft’s wing spar into an Automated Spar Assembly Tool. The on-time milestone brings the program another step closer to delivering the U.S. Air Force’s next-generation aerial refueling tanker. The event comes less than two months after the KC-46 program began to assemble the first of four Engineering, Manufacturing and Development test aircraft. The wing spar, the main structural component of the wing, is 82 feet 5 inches long and provides critical support for flight loads and the weight of the wings.

“Completing production of the four test aircraft on schedule is our priority as we prepare to enter the flight test phase of the program,” said Maj. Gen. John Thompson, U.S. Air Force Program Executive Officer for Tankers. “The program continues to meet or exceed all contract milestones.”

The first test aircraft is expected to roll out of the factory in January 2014, while the second is scheduled to leave the factory in March. Boeing plans to fly the fully provisioned tanker for the first time in early 2015 and make the first delivery in 2016. The company expects to build and deliver the first 18 KC-46As by 2017 and a total of 179 by 2027 if all options under the contract are exercised.

“We’re exactly where we want to be right now,” said Maureen Dougherty, Boeing vice president and KC-46 Tanker program manager. “One year from now, all four test aircraft will be out of the factory, and the first two will be flying.”

The KC-46A is based on the Boeing 767 commercial jetliner, a proven airframe in service as an airliner, freighter and tanker. Boeing has delivered more than 1,050 767s worldwide.

“Production of the first tanker is going smoothly and remains on schedule,” said Scott Campbell, 767 vice president and general manager, Boeing Commercial Airplanes.

(USAF artist's rendering)

FMI: www.af.mil, www.boeing.com

Advertisement

More News

ANN's Daily Aero-Term (04.26.24): DETRESFA (Distress Phrase)

DETRESFA (Distress Phrase) The code word used to designate an emergency phase wherein there is reasonable certainty that an aircraft and its occupants are threatened by grave and i>[...]

ANN's Daily Aero-Linx (04.26.24)

Aero Linx: The International Association of Missionary Aviation (IAMA) The International Association of Missionary Aviation (IAMA) is comprised of Mission organizations, flight sch>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne-NextGen 04.23.24: UAVOS UVH 170, magni650 Engine, World eVTOL Directory

Also: Moya Delivery Drone, USMC Drone Pilot, Inversion RAY Reentry Vehicle, RapidFlight UAVOS has recently achieved a significant milestone in public safety and emergency services >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC