NASA: Get Shuttles Flying By Fall | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Sat, Mar 15, 2003

NASA: Get Shuttles Flying By Fall

Engineers Told To Be Ready For Change Orders

America will return to space with the shuttle program. If NASA has its way, shuttles will be launching again by Fall.

NASA officials said Friday steps to improve shuttle safety will not wait for the findings of the Columbia Accident Investigation Board, which is trying to track down why the shuttle disintegrated as it re-entered the atmosphere on Feb. 1.

NASA's spaceflight chief Bill Readdy disclosed Friday a memo dated Wednesday, which outlines the steps shuttle program managers need to take to get the fleet ready to fly as early as next Fall.

What, No Pictures?

Readdy also talked with reporters on Friday about his role in a decision to pass up opportunities for satellite imagery of the shuttle during flight. Columbia was hit on its left wing by insulation falling off the external fuel tank. Engineers assessed possible damage and determined there was not a safety issue.

Contrary to reports in Friday's edition of the Washington Post, Readdy said a request to try to obtain images of the shuttle's wing with orbiting spy satellites was never made. A colleague had discussed the issue with an agency capable of tasking the satellites, such as the National Imagery and Mapping Agency, and told Readdy the offer to image Columbia was on the table. NASA would have to request the service on an emergency or high-priority basis.

They Could Have, But They Didn't

"My understanding was that the (space shuttle program) was well aware of those capabilities ... and it had concluded that the offer would not contribute to the analysis," Readdy (right) said, reading from a memo he sent two days after the accident to the investigation board, Congress and the agency's Inspector General.

"The conclusion reached by the mission management team was that there was no safety of flight issue and for those reasons there was no rationale for requesting emergency or high-priority support," the memo said.

"If we had thought for a moment there was a problem, we would have asked," Readdy added.

Readdy's memo stated he had no problem if the other agency wanted to image Columbia on a "not-to-interfere" basis, meaning, for example, the orbiter would not change its position to support photography.

Changes Coming

In light of the accident, the external tank insulation is enough of a concern that NASA plans to change how the foam is applied to the tank, Columbia investigation board chairman Harold Gehman said earlier this week.

In his memo, Readdy told program managers to:

  • conduct a thorough review of key space shuttle systems;
  • develop concepts for on-orbit inspection and repair of shuttle's thermal protection system;
  • review policies for obtaining photographic and radar coverage of the shuttle during critical flight phases; and
  • review failure modes and effects, the shuttle's critical items lists, waivers, hazards, and the process for identifying and resolving in-flight safety-of-flight issues.
FMI: www.nasa.gov

Advertisement

More News

Airborne-Flight Training 05.09.24: ERAU at AIAA, LIFT Diamond Buy, Epic A&P

Also: Vertical Flight Society, NBAA Maintenance Conference, GA Honored, AMT Scholarship For the first time, students from Embry-Riddle’s Daytona Beach, Florida, campus took t>[...]

ANN's Daily Aero-Term (05.07.24): Hazardous Weather Information

Hazardous Weather Information Summary of significant meteorological information (SIGMET/WS), convective significant meteorological information (convective SIGMET/WST), urgent pilot>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

NTSB Final Report: Cessna 150

(FAA) Inspector Observed That Both Fuel Tanks Were Intact And That Only A Minimal Amount Of Fuel Remained In Each Analysis: According to the pilot, approximately 8 miles from the d>[...]

Aero-News: Quote of the Day (05.08.24)

“Pyka’s Pelican Cargo is unlike any other UAS solution on the market for contested logistics. We assessed a number of leading capabilities and concluded that the Pelica>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC