Cobham Announces ADS-B INTEGRITY Test Application | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.14.24

Airborne-Unlimited-05.15.24 Airborne-AffordableFlyers-05.16.24

Airborne-Unlimited-05.17.24

Wed, Nov 02, 2016

Cobham Announces ADS-B INTEGRITY Test Application

New Product Introduced At The 2016 NBAA-BACE Convention And Tradeshow In Orlando

Cobham AvComm, has announced its new ADS-B INTEGRITY Test Application. The new app controls Cobham’s IFR6000 or IFR6015 Transponder Test Sets and GPSG-1000 Positional Simulator to support Supplemental Type Certification (STC) and post approval testing for ADS-B equipment installations per FAA Advisory Circular AC 20-165B.

For R&D and factory test, the app will control Cobham’s IFF-45TS/A MK XII/A Bench Test Set and the GPSG-1000 for ADS-B Out performance. A complete, detailed ADS-B Out compliance report in FAA format, including a measurement for total latency, can be generated showing Pass/Fail criteria.

The following is taken from the FAA.gov website:

  • Any airspace that requires the use of a Transponder today will on January 01, 2020 also require aircraft to be equipped with a Version 2 ADS-B Out system. This can be either a 1090ES (DO-260B) ADS-B system or a UAT (DO-282B) ADS-B system.
  • For aircraft operating above FL180 (18,000 ft.) or to comply with ADS-B mandates outside the United States, you must be equipped with a Mode-S transponder-based ADS-B transmitter. For aircraft operating below 18,000 ft. and within the United States ADS-B rule airspace, you must be equipped with either a Mode-S transponder-based ADS-B transmitter or with UAT equipment.

“We’re very excited to introduce to the industry an application that will allow a complete test of AC 20-165B prior to flying the aircraft,” said Guy Hill, Director of Avionics Test Products for Cobham AvComm. “Equipment installations can be completed more quickly and with fewer issues to help save time and money.”

(Source: Cobham news release)

www.cobham.com/avcomm

Advertisement

More News

ANN's Daily Aero-Term (05.16.24): Instrument Runway

Instrument Runway A runway equipped with electronic and visual navigation aids for which a precision or nonprecision approach procedure having straight-in landing minimums has been>[...]

ANN's Daily Aero-Linx (05.16.24)

Aero Linx: Alaska Airmen's Association The Alaska Airmen's Association includes over 2,000 members—we are one of the largest General Aviation communities in the country. We s>[...]

Airborne 05.15.24: Ghost Sq MidAir, B-2 Junked, Dream Chaser Readies

Also: Flt School Security, G600 Steep-Approach, Honduran Aid, PW545D Cert Two aircraft performing at the Fort Lauderdale Air Show clipped wings during a routine last Sunday, spooki>[...]

Airborne 05.10.24: Icon Auction, Drunk MedEvac Pilot, Bell ALFA

Also: SkyReach Parts Support, Piper Service Ctr, Airliner Near-Miss, Airshow London The Judge overseeing Icon's convoluted Chapter 11 process has approved $9 million in Chapter 11 >[...]

Airborne Affordable Flyers 05.16.24: PRA Runway, Wag-Aero Sold, Young Eagles

Also: Paramotor Champ's, Electric Ultralight, ICON BK Update, Burt Rutan at Oshkosh! The Popular Rotorcraft Association is reaching out for help in rebuilding their private runway >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC