Boeing Statement On Employee Messages Provided To The U.S. Congress And FAA | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Tue, Jan 14, 2020

Boeing Statement On Employee Messages Provided To The U.S. Congress And FAA

Says Company Is Confident That All Of Boeing’s MAX Simulators Are Functioning Effectively

Boeing released a public statement last week after it provided employee messages to both the U.S. Congress and the FAA.

"In December, Boeing proactively brought these communications to the FAA’s attention in furtherance of the company’s commitment to transparency with our regulator and strong safety oversight of our industry. We also provided copies to the Senate Committee on Commerce, Science, and Technology and the House Committee on Transportation and Infrastructure in recognition of their oversight functions. These documents have been released publicly at the encouragement of Chairman DeFazio and Chairman Wicker," The company said in the statement.

"Some of these communications relate to the development and qualification of Boeing’s MAX simulators in 2017 and 2018. These communications contain provocative language, and, in certain instances, raise questions about Boeing’s interactions with the FAA in connection with the simulator qualification process.

"Having carefully reviewed the issue, we are confident that all of Boeing’s MAX simulators are functioning effectively. The qualification activities referenced in these communications occurred early in the service life of these simulators. Since that time, both internal and external subject matter experts have repeatedly tested and qualified the simulators at issue. Indeed, more than twenty regulatory qualifications of MAX simulators, performed by the FAA and multiple international regulators, have been conducted since early 2017. The specific Miami simulator that was used for the early qualification tests has been re-evaluated six times during this time period. The simulator software has been constantly improving during this time, through repeated cycles of testing, qualification, and revision of the software code.

"These communications do not reflect the company we are and need to be, and they are completely unacceptable. That said, we remain confident in the regulatory process for qualifying these simulators.

"In the context of providing these communications to the FAA, and having carefully considered the FAA’s perspective on these matters, we also decided to provide additional documents that were identified in the course of legal reviews of the 737 MAX program. We provided these documents to the FAA and Congress as a reflection of our commitment to transparency and cooperation with the authorities responsible for regulating and overseeing our industry. We welcome, and will fully support, any additional review the FAA believes is appropriate in connection with any of these matters, as well as the continued involvement of the relevant congressional committees with these issues.

"We regret the content of these communications, and apologize to the FAA, Congress, our airline customers, and to the flying public for them. We have made significant changes as a company to enhance our safety processes, organizations, and culture. The language used in these communications, and some of the sentiments they express, are inconsistent with Boeing values, and the company is taking appropriate action in response. This will ultimately include disciplinary or other personnel action, once the necessary reviews are completed."

(Source: Boeing news release)

FMI: www.boeing.com

Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC