GAO Report: FAA Needs IT Management, Oversight Improvement | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Sat, Sep 25, 2004

GAO Report: FAA Needs IT Management, Oversight Improvement

Agency performed well in planning, requirements management and technical analysis

The GAO has issued a pair of reports that point to problems with IT management and oversight at the Federal Aviation Administration. specifically, the report states that the FAA needs to improveme its software acquisition processes and work to eliminate a series of weak points that will lead to cost overruns, delays and other shortfalls.

The reports, according to Government Computer News, state that the FAA is doing well in the areas of project planning, requirements management and the identification of approaches to resolve technical issues related to the acquisition of IT technology.

However, it also found shortcomings in the agency's verification, QA and performance measurement, as well as in needs analysis. GAO also applauded the agency's adoption of the Integrated Capability Maturity Model to analyze software development skill maturity, but noted that project managers are being given the option to use or ignore the Model in their projects.

“The projects that have adopted the model have demonstrated growth in the maturity of their processes, and more and more projects have adopted the model,” GAO said.  “The recurring weaknesses we identified in our project-specific evaluations are due in part to the choices these projects were given in deciding whether and how to adopt this process improvement initiative."

The report recommends that the FAA implements the model, or an equivalent, in the entire Air Traffic Organization, and should standardize its measurement and oversight processes throughout the agency.

FAA officials expressed general agreement with the audit findings and have begin implementing the recommendations.

FMI: www.gao.gov/new.items/d04901.pdf, www.gao.gov/new.items/d04822.pdf

Advertisement

More News

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Term (05.06.24): Altitude Readout

Altitude Readout An aircraft’s altitude, transmitted via the Mode C transponder feature, that is visually displayed in 100-foot increments on a radar scope having readout cap>[...]

ANN's Daily Aero-Linx (05.06.24)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC