Virgin Orbit Confirms Target Date For 1st Launch Attempt | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Thu, May 21, 2020

Virgin Orbit Confirms Target Date For 1st Launch Attempt

Next Week Is Obviously Going To Be 'Space Week!' (And We Can't Wait...)

Our friends at Virgin Orbit have released details about Virgin Orbit's first attempt to launch a payload into space from a cradle slung underneath a modified Boeing 747.

They seem pretty excited...

"We are extremely excited to announce that the window for our Launch Demo mission starts on Sunday, May 24th, and extends through Monday, May 25th, with an opportunity to launch from 10 A.M. – 2 P.M. Pacific (17:00 – 21:00 GMT) each day. That means that this weekend, our 747 carrier aircraft Cosmic Girl will prepare to take off from Mojave Air and Space Port, fly out over the Pacific ocean, and release our two-stage, orbital rocket, LauncherOne — which will then proceed to ignite its engine in mid-air for the first time.

This Launch Demo marks the apex of a five-year-long development program. On our journey to open up space for everyone we’ve conducted hundreds of hotfires of our engines and our rocket stages, performed two dozen test flights with our carrier aircraft, and conducted countless other tests of every bit of the system we could test on the ground.

Launching from the Earth to space is mind-bogglingly difficult. Thousands of components all need to function as planned while controlling high energy and flying at incredibly fast speeds. The vehicle’s structures must be robust enough to tolerate traveling at up to 18,000 mph without disintegrating; the temperatures and pressures of its propellants can’t be too high or too low; every internal valve must click open and closed in perfect synchronicity…  There’s a long list of factors that need to line up in order to make it all the way. We’re mindful of the fact that for the governments and companies who have preceded us in developing spaceflight systems, maiden flights have statistically ended in failure about half of the time.

In the future, the goal of our launches will be to deploy satellites for a new generation of space-based services. For this Launch Demo, though, our goal is to safely learn as much as possible and prove out the LauncherOne system we’ve worked so hard to design, build, test and operate.

The instant our Newton Three engine ignites, we will have done something no one has ever done before — lighting an orbital-class, liquid-fueled, horizontally-launched vehicle in flight. If LauncherOne reaches an altitude of 50 miles on this mission, it will be the first time this kind of launch system has reached space.

We’ll continue the mission for as long as we can. The longer LauncherOne flies, the more data we’ll be able to collect. Should we defy the historical odds and become one of those exceedingly rare teams to complete a mission on first attempt, we will deploy a test payload into an orbit, take our data, and then quickly de-orbit so as not to clutter the heavens."

We'll keep you updated...

FMI: www.virginorbit.com

 


Advertisement

More News

ANN's Daily Aero-Term (04.24.24): Runway Lead-in Light System

Runway Lead-in Light System Runway Lead-in Light System Consists of one or more series of flashing lights installed at or near ground level that provides positive visual guidance a>[...]

ANN's Daily Aero-Linx (04.24.24)

Aero Linx: Aviation Without Borders Aviation Without Borders uses its aviation expertise, contacts and partnerships to enable support for children and their families – at hom>[...]

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

Classic Aero-TV: Best Seat in The House -- 'Inside' The AeroShell Aerobatic Team

From 2010 (YouTube Version): Yeah.... This IS A Really Cool Job When ANN's Nathan Cremisino took over the lead of our Aero-TV teams, he knew he was in for some extra work and a lot>[...]

Airborne Affordable Flyers 04.18.24: CarbonCub UL, Fisher, Affordable Flyer Expo

Also: Junkers A50 Heritage, Montaer Grows, Dynon-Advance Flight Systems, Vans' Latest Officially, the Carbon Cub UL and Rotax 916 iS is now in its 'market survey development phase'>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC