One-Thousandth Boeing 777 Forward Fuselage Section Heads To Everett | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Mon, Dec 12, 2011

One-Thousandth Boeing 777 Forward Fuselage Section Heads To Everett

One Of Five Major Assemblies For The Triple-7 Fabricated By Spirit AeroSystems

Spirit AeroSystems this week celebrated completion of the 1,000th Boeing 777 forward fuselage section, which will be shipped to Boeing's final assembly facility in Everett, WA.

"Today we congratulate not only our customer Boeing on this significant milestone, but also the employees at Spirit who have been instrumental to this program," said Mike King, senior vice president and chief operations officer. "Their dedication and relentless drive toward continuous improvement shows with the success of this airplane."

The 777 forward fuselage is built in five major sections at Spirit's Wichita, KS, facility, then loaded onto rail cars and shipped to Boeing for final assembly. The majority of the aluminum alloy section is designed in CATIA computer software by Spirit and Boeing engineers.

"We are very proud to be part of such a tremendous event and congratulate our partner Boeing for such a successful aircraft," said David Coleal, senior vice president/general manager, Fuselage Segment. "As the world's largest supplier of commercial assemblies and components, Spirit fuselage employees are excited and proud to celebrate another significant achievement with the production of the 1,000th 777 fuselage for our Boeing customer. This highly skilled fuselage team takes great pride in producing the highest quality aerostructures in the world."

Spirit AeroSystems also supplies the forward fairing, strut, thrust reverser assembly, inlet and fan cowl assemblies, floor beams, seat tracks, leading edge slats and fixed leading edge for the 777 family of airplanes.

The 1,000th 777 is scheduled to be completed by Boeing in February and delivered to customer Emirates in March.

FMI: www.spiritaero.com

Advertisement

More News

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Term (05.06.24): Altitude Readout

Altitude Readout An aircraft’s altitude, transmitted via the Mode C transponder feature, that is visually displayed in 100-foot increments on a radar scope having readout cap>[...]

ANN's Daily Aero-Linx (05.06.24)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC