Airport Board: Stop Runway Study | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Sun, Sep 14, 2003

Airport Board: Stop Runway Study

Abrupt End To Investigating Lengthened Runway At Hilton Head (SC)

Here's what's not going to happen at the Hilton Head Airport (SC): The study to examine lengthening the runway. The Beaufort County Aviation Board made that unanimous decision Thursday.

The Carolina Morning News reports a contract to draft an airport consulting contract at Hilton Head had been put on hold pending the decision. "The board doesn't feel (a study) is needed at this time," said board Vice Chairman Pete Buchanan, who chaired the meeting in Chairman Harvey Ewing's absence. "There are feelings that Hilton Head's general population doesn't want a larger runway."

The question is addressed on the airport's website. In the FAQ section, it says, "Why doesn't US Airways Express have non-stop service or jet service to/from the Hilton Head Airport?"

The answer: "Hilton Head Airport respects the wishes of the island's residents. Therefore, when Beaufort County promised that the runway would not be extended to accommodate larger and louder aircraft, the Hilton Head Airport became limited to smaller corporate jets and turboprop commuter planes. "US Airways serves Hilton Head Island with the De Havilland Dash 8, a 37-seat (or 50-seat) cabin-class aircraft, which is as large and provides as much seating space as most regional jets."

The problem, of course, is that US Airways and most other major carriers are converting their propjet fleets to regional jets. A 4,300-foot runway is not big enough for the regional jets that other commercial carriers use. "If Piedmont really parks (its Dash 8s) and is the only game in town, we're not going to have any passengers out there," Buchanan said. But he also said, "there may be people who come around and say, 'here's an opportunity,' and make up their own little carrier" service with turboprops.

Doesn't sound like Hilton Head is going to budge on this one.

FMI: www.hiltonheadairport.com

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC