Boeing Completes Flight Testing For Certification Of 787s With GE Engines | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Fri, Mar 09, 2012

Boeing Completes Flight Testing For Certification Of 787s With GE Engines

Completes All Flight Testing On Baseline Dreamliner

All flight tests expected to be required for type certification of the 787-8 Dreamliner with General Electric GEnx engines have been completed. This marks the end of all certification flight testing associated with the baseline model of the 787. Testing on engine and airframe improvements will continue as needed, as it does for all airplane programs.

Ground testing to complete certification requirements has also concluded.

"The last phase of testing focused on extended operations on board a production airplane," said Mike Sinnett, vice president and chief project engineer, 787 program. "The airplane performed beautifully during this testing, further demonstrating its reliability."

The final flight concluded late last month with the landing of the 35th 787 built. Flight testing is one of many elements reviewed by the U.S. Federal Aviation Administration before it certifies a new airplane type. Certification of the 787 Dreamliner with Rolls-Royce engines was completed in August 2011. Each new combination of airframe type and engine requires additional certification.

"I want to congratulate all of the men and women of Boeing and our partners who helped support our flight test program," Sinnett said. "They have completed the most robust, thorough flight test program in our history."

The Boeing 787 Dreamliner features a wide array of passenger amenities including larger windows, cleaner air, higher humidity and a lower cabin altitude.

FMI: www.boeing.com

Advertisement

More News

Sierra Space Repositions Dream Chaser for First Mission

With Testing Soon Complete, Launch Preparations Begin in Earnest Sierra Space's Dream Chaser has been put through the wringer at NASA's Glenn Armstrong Test Facility in Ohio, but w>[...]

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

ANN's Daily Aero-Term (05.11.24): IDENT Feature

IDENT Feature The special feature in the Air Traffic Control Radar Beacon System (ATCRBS) equipment. It is used to immediately distinguish one displayed beacon target from other be>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC