RDD Announces Major Upgrade For Lancair IV-P | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Tue, Dec 15, 2015

RDD Announces Major Upgrade For Lancair IV-P

LX7 Replaces Original Wings, Aft Fuselage, And Tail Components

A major upgrade has been announced for the Lancair IV and IV-P airframes by RDD Enterprises, LLC.

The conversion has been dubbed LX7. It replaces the original wings, aft fuselage and tail with new components utilizing lighter and stronger materials as well as modern airfoils with improved slow flight and stall characteristics. Each LX7 will be provisioned with all new electrical systems and components and include an aircraft parachute, and a 3 screen Integrated Flight Deck. There have also been upgrades to the interior of the aircraft.

“The Lancair IV-P has long been the standard of efficiency and speed for personal aircraft,” stated Mark Mahnke, a principal at RDD. “This new conversion opens up that historic performance to a new generation of pilots.

“We feel that adding the most modern safety features to the classic performance of the Lancair IV will be a home run for today’s pilot.”

“We have cleared many of the design hurdles utilizing the latest in computer aided design software,” said Eric Schmidlin, RDD project manager. “Our goal is to provide an outstanding passenger comfort level with engaging flight response for the pilot.” World class engineering has been employed to ensure each part of the LX7 meets the overall goals of the product. Tooling has been produced for some of the parts and final assembly of the first aircraft is expected Spring 2016.

(Images from file)

FMI: http://www.rddent.com/lx7.html

Advertisement

More News

Sierra Space Repositions Dream Chaser for First Mission

With Testing Soon Complete, Launch Preparations Begin in Earnest Sierra Space's Dream Chaser has been put through the wringer at NASA's Glenn Armstrong Test Facility in Ohio, but w>[...]

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

ANN's Daily Aero-Term (05.11.24): IDENT Feature

IDENT Feature The special feature in the Air Traffic Control Radar Beacon System (ATCRBS) equipment. It is used to immediately distinguish one displayed beacon target from other be>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC