Fincke's Oxygen Leak Pinned Down | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Mon, Jun 28, 2004

Fincke's Oxygen Leak Pinned Down

Next ISS Spacewalk: June 29th

Specialists in Moscow Sunday continued to analyze the cause of an unexpectedly high rate of pressure loss in the primary oxygen bottle on Astronaut Mike Fincke’s Russian space suit, which terminated Thursday’s spacewalk after 14 minutes.

Planners have retargeted the Extravehicular Activity (EVA) for no earlier than Tuesday, June 29, based on Russian ground station communication coverage. That is expected to be confirmed Monday following the next meeting of the International Space Station’s (ISS) Mission Management Team.

Almost immediately after switching their Orlan spacesuits to internal power and opening the Pirs Docking Compartment hatch to start the EVA, Fincke and Expedition 9 Commander Gennady Padalka were told to terminate the spacewalk and begin troubleshooting efforts to determine the cause of the pressure loss in the primary oxygen tank on Fincke’s suit.

Once the ISS was reconfigured for normal operations, the troubleshooting began, which stretched into today with additional evaluations focusing on an injector switch that increases the flow of oxygen into the Orlan spacesuit. The crew cycled the switch on and off several times, while observing the suit injector system’s status light.

Though investigation into the cause of the injector switch problem will continue throughout the weekend, Russian flight controllers assured the crew that its procedures were executed properly and it could expect to use the same suits when the spacewalk is rescheduled.

The objective of the spacewalk is to restore power to Control Moment Gyroscope (CMG) #2 by replacing a Remote Power Controller Module (RPCM). CMG #2 was taken off line April 21 by a failure of a circuit breaker in the RPCM. Currently, because of the failure of CMG #1 about two years ago, the attitude of the Station is being adequately controlled by the two remaining CMGs.

FMI: http://spaceflight.nasa.gov

Advertisement

More News

ANN's Daily Aero-Term (04.26.24): DETRESFA (Distress Phrase)

DETRESFA (Distress Phrase) The code word used to designate an emergency phase wherein there is reasonable certainty that an aircraft and its occupants are threatened by grave and i>[...]

ANN's Daily Aero-Linx (04.26.24)

Aero Linx: The International Association of Missionary Aviation (IAMA) The International Association of Missionary Aviation (IAMA) is comprised of Mission organizations, flight sch>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne-NextGen 04.23.24: UAVOS UVH 170, magni650 Engine, World eVTOL Directory

Also: Moya Delivery Drone, USMC Drone Pilot, Inversion RAY Reentry Vehicle, RapidFlight UAVOS has recently achieved a significant milestone in public safety and emergency services >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC