First Major Assembly Delivered For Sikorsky CH-53K Heavy Lift Helicopter | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Fri, Sep 10, 2010

First Major Assembly Delivered For Sikorsky CH-53K Heavy Lift Helicopter

GKN Aerospace Employs Latest Design And Manufacturing Techniques

The first major structural assembly for the CH-53K heavy lift helicopter has been delivered by GKN Aerospace to Sikorsky Aircraft Corp. The CH-53K helicopter's aft transition fuselage section measures approximately 20 feet long by 9 feet wide and 9 feet high and features an advanced hybrid composite, aluminium and titanium structure covered with external composite skins.

The work is being undertaken as part of a multi-year System Design & Development (SDD) contract in which GKN Aerospace was accorded full design authority and manufacturing responsibility for the CH-53K helicopter aft transition fuselage section, cargo ramp, and overhead door structural assemblies. GKN Aerospace was awarded the contract in 2007 and will deliver seven development ship sets to Sikorsky by 2012.

Structural design was carried out by the GKN Aerospace Engineering Development Center in Nashville, TN, while manufacturing takes place at the Company's plant in St. Louis, MO. Full production of 156 ship sets is expected to commence in 2013 and continue through 2022.


Sikorsky Image

To meet demanding CH-53K helicopter program weight, durability and affordability objectives, GKN Aerospace is employing the latest design and manufacturing technologies including automated fiber placement (AFP), automated trim and drill and digital inspection. In total, more than 1,000 separate metallic and composite detailed parts per aircraft are manufactured and assembled by the GKN Aerospace team.

FMI: www.gknaerospace.com

Advertisement

More News

Airborne-Flight Training 05.09.24: ERAU at AIAA, LIFT Diamond Buy, Epic A&P

Also: Vertical Flight Society, NBAA Maintenance Conference, GA Honored, AMT Scholarship For the first time, students from Embry-Riddle’s Daytona Beach, Florida, campus took t>[...]

ANN's Daily Aero-Term (05.07.24): Hazardous Weather Information

Hazardous Weather Information Summary of significant meteorological information (SIGMET/WS), convective significant meteorological information (convective SIGMET/WST), urgent pilot>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

NTSB Final Report: Cessna 150

(FAA) Inspector Observed That Both Fuel Tanks Were Intact And That Only A Minimal Amount Of Fuel Remained In Each Analysis: According to the pilot, approximately 8 miles from the d>[...]

Aero-News: Quote of the Day (05.08.24)

“Pyka’s Pelican Cargo is unlike any other UAS solution on the market for contested logistics. We assessed a number of leading capabilities and concluded that the Pelica>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC