Curiosity Resumes Science After Analysis Of Voltage Issue | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Wed, Nov 27, 2013

Curiosity Resumes Science After Analysis Of Voltage Issue

Full Operations Resumed Saturday

NASA's Mars rover Curiosity resumed full science operations on Saturday, Nov. 23. Activities over the weekend included use of Curiosity’s robotic arm to deliver portions of powdered rock to a laboratory inside the rover. The powder has been stored in the arm since the rover collected it by drilling into the target rock "Cumberland" six months ago. Several portions of the powder have already been analyzed. The laboratory has flexibility for examining duplicate samples in different ways.

The decision to resume science activities resulted from the success of work to diagnose the likely root cause of a Nov. 17 change in voltage on the vehicle. The voltage change itself did not affect the rover safety or health. The vehicle's electrical system has a "floating bus" design feature to tolerate a range of voltage differences between the vehicle's chassis -- its mechanical frame -- and the 32-volt power lines that deliver electricity throughout the rover. This protects the rover from electrical shorts.
 
"We made a list of potential causes, and then determined which we could cross off the list, one by one," said rover electrical engineer Rob Zimmerman of NASA's Jet Propulsion Laboratory, Pasadena, CA. Science operations were suspended for six days while this analysis took priority. The likely cause is an internal short in Curiosity's power source, the Multi-Mission Radioisotope Thermoelectric Generator. Due to resiliency in design, this short does not affect operation of the power source or the rover. Similar generators on other spacecraft, including NASA's Cassini at Saturn, have experienced shorts with no loss of capability. Testing of another Multi-Mission Radioisotope Thermoelectric Generator over many years found no loss of capability in the presence of these types of internal shorts.

Following the decision to resume science activities, engineers learned early Nov. 23 that the rover had returned to its pre-Nov. 17 voltage level. This reversal is consistent with their diagnosis of an internal short in the generator on Nov. 17, and the voltage could change again. The analysis work to determine the cause of the voltage change gained an advantage from an automated response by the rover's onboard software when it detected the voltage change on Nov. 17. The rover stepped up the rate at which it recorded electrical variables, to eight times per second from the usual once per minute, and transmitted that engineering data in its next communication with Earth. "That data was quite helpful," Zimmerman said.
 
In subsequent days, the rover performed diagnostic activities commanded by the team, such as powering on some backup hardware to rule out the possibility of short circuits in certain sensors.

(Image provided by NASA)

FMI: www.nasa.gov

Advertisement

More News

Airborne-Flight Training 05.09.24: ERAU at AIAA, LIFT Diamond Buy, Epic A&P

Also: Vertical Flight Society, NBAA Maintenance Conference, GA Honored, AMT Scholarship For the first time, students from Embry-Riddle’s Daytona Beach, Florida, campus took t>[...]

ANN's Daily Aero-Term (05.07.24): Hazardous Weather Information

Hazardous Weather Information Summary of significant meteorological information (SIGMET/WS), convective significant meteorological information (convective SIGMET/WST), urgent pilot>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

NTSB Final Report: Cessna 150

(FAA) Inspector Observed That Both Fuel Tanks Were Intact And That Only A Minimal Amount Of Fuel Remained In Each Analysis: According to the pilot, approximately 8 miles from the d>[...]

Aero-News: Quote of the Day (05.08.24)

“Pyka’s Pelican Cargo is unlike any other UAS solution on the market for contested logistics. We assessed a number of leading capabilities and concluded that the Pelica>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC