Analyst Calls Boeing's Dreamliner Goal 'Near-Herculean' | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Thu, Nov 15, 2007

Analyst Calls Boeing's Dreamliner Goal 'Near-Herculean'

Has Doubts Planemaker Will Be Able To Build Over 100 Planes By 2010

Financial consultants aren't typically prone to hyperbole... which makes statements by an analyst with Bear Sterns, on Boeing's stated goal to build more than 100 787 Dreamliners in two years, all the more compelling.

Analyst Steve Binder says he has his doubts Boeing will be able to stick to its ambitious goals -- especially given the planemaker hasn't flown the first Dreamliner yet, and announced delays in initial production last month.

"Reaching the planned monthly production rates to achieve 109 deliveries by the end of 2009 is still a near-Herculean task, in our view," said Binder, shortly after a meeting with Boeing management to get an update on the 787 program.

Despite that less-than-optimistic summation, however, Binder adds Boeing "shares still offer a relatively attractive risk-reward profile over the next six months," despite the risk of further delays keeping the lid on likely yields below 15 percent.

After seeing a strong rise in share value over the past 18 months, Boeing's shares have since dropped off 13% since the beginning of October, ahead of the planemaker's October 10 announcement of a six-month delay in development and first deliveries of the composite-bodied 787.

Despite the delay, for the moment Boeing says it will still produce 109 Dreamliners by the end of 2009 -- only three less than it had originally planned in the same period.

We dunno... "near-Herculean" may not even cover it...

FMI: www.boeing.com, www.bearsterns.com

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC