First Roll-Out Of Ariane 6 Mobile Gantry | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Wed, Jul 31, 2019

First Roll-Out Of Ariane 6 Mobile Gantry

Provides Access To Launch Vehicles For Integration On The Launch Pad

At Europe’s Spaceport the Ariane 6 mobile gantry, a 250-foot tall metallic structure built to house Ariane 6 underwent a 320-foot rollout test last week to mimic prelaunch.

When fully equipped, this mobile gantry will weigh 8200 metric tons – more than a thousand metric tons heavier than France's Eiffel Tower. Its platforms provide access to the launch vehicle for integration on the launch pad. It protects Ariane 6 until its doors are opened and it is retracted about five hours before the launch.

The mobile gantry stands on 16 bogies, each bogie comprises eight wheels and each wheel is equipped with one electric motor. A total of 128 electric motors synchronise to set the wheels in motion along rails.

“Preparation is everything but the actual move is automated and quite simple,” explained Jean-Michel Rizzi, ESA’s Ariane 6 Launch Base Project Manager, “You choose to move the gantry forward or backwards and then press the start button.

“There are three speeds. The first and last meter are done at the slowest speed of a meter per minute. This increases to a ‘cruising’ speed of 7.6 meters per minute for a 130 m stretch and then slowed back down to 3 m per minute in the decelerating phase over a distance of 9 m. The full rollout of 141 m takes 22 minutes.”

Over the next five weeks this test will be repeated several times and after each test, the mobile gantry will be rolled back to its initial pulled back position. Current works being carried out around the nearby mast will soon be finished allowing the mobile gantry to follow the full track length. Engineers will measure speed, the profile of electrical power being drawn during the rollouts, and the synchronisation of all 128 motors.

The Ariane 6 Launch Base construction is nearly complete and final tests are proving the infrastructures are ready for handover from industry to CNES, France’s Space Agency. These rollouts are part of this process. At the end of this year all systems are expected to be fully integrated.

After a successful Launch Base Technical Qualification Review, CNES will hand over the launch base to ESA.

(Image provided with ESA news release)

FMI: www.esa.int

Advertisement

More News

Airborne-Flight Training 05.09.24: ERAU at AIAA, LIFT Diamond Buy, Epic A&P

Also: Vertical Flight Society, NBAA Maintenance Conference, GA Honored, AMT Scholarship For the first time, students from Embry-Riddle’s Daytona Beach, Florida, campus took t>[...]

ANN's Daily Aero-Term (05.07.24): Hazardous Weather Information

Hazardous Weather Information Summary of significant meteorological information (SIGMET/WS), convective significant meteorological information (convective SIGMET/WST), urgent pilot>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

NTSB Final Report: Cessna 150

(FAA) Inspector Observed That Both Fuel Tanks Were Intact And That Only A Minimal Amount Of Fuel Remained In Each Analysis: According to the pilot, approximately 8 miles from the d>[...]

Aero-News: Quote of the Day (05.08.24)

“Pyka’s Pelican Cargo is unlike any other UAS solution on the market for contested logistics. We assessed a number of leading capabilities and concluded that the Pelica>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC