NASA: Maybe a Year Before Next Shuttle Flight | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Fri, Oct 03, 2003

NASA: Maybe a Year Before Next Shuttle Flight

Mid-September New Target Date

Suddenly concerned in public that perhaps some corrosion on Atlantis might have gone unnoticed, reports are coming from NASA that the next Shuttle mission could be launched no earlier than mid-September, 2004.

NASA spokesman James Hartsfield said that such problems were discovered and fixed on Discovery and Endeavour.

The last 'heavy' maintenance Atlantis received (other than during the unrelated flat-panel cockpit upgrade three+ years ago) was in 1997~98, when Hartsfield said the agency admitted it may not have checked deeply enough for troubles possibly lurking under the nose cap of Atlantis. "The reason we are discussing this is to understand whether removing the nose cap and inspecting it is something we need to do to make sure Atlantis’s thermal protection system is safe for flight," Hartsfield said.

Why Discovery or Endeavour couldn't be ready sooner -- perhaps the next missions are so specific that particular equipment couldn't be transfered -- was not discussed.

Of course, if the launch date slips much past the end of September, the shorter days (NASA recently amended its flight rules to allow only daylight shuttle launches) and colder nights (ice, O-ring shrinkage) could delay a launch until the Spring of 2005. Meanwhile, the ISS crew keeps it together, performing construction and experiments on a greatly-amended schedule, relying on the Russian Soyuz program to keep the Station going, and manned.

FMI: www.nasa.gov

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC