Docked, Locked, And Ready To Rock: STS-123 Arrives At ISS | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Thu, Mar 13, 2008

Docked, Locked, And Ready To Rock: STS-123 Arrives At ISS

First Spacewalk Scheduled For Thursday Night

NASA states the combined crews of space shuttle Endeavour and the International Space Station have completed their first day as an orbital team, beginning 12 days of joint operations.

About an hour before docking at the ISS -- which occurred at 2349 EDT Wednesday, about 24 minutes later than planned -- STS-123 Commander Dominic Gorie guided the shuttle through a back-flip maneuver, giving the Expedition 16 crew the opportunity to take pictures of the orbiter’s protective heat-resistant tiles.

These photos were sent to engineers on Earth for analysis. So far, NASA is optimistic Endeavour sustained no serious damage during its early morning liftoff Tuesday.

The STS-123 and Expedition 16 crews opened the hatches between Endeavour and the station at 0136 EDT. The crews then spent time preparing for the first of five scheduled STS-123 spacewalks, which Mission Specialist Rick Linnehan and Expedition 16 Flight Engineer Garrett Reisman will begin at 2123 Thursday.

Shortly after Endeavour’s arrival at the station, Reisman traded places with Flight Engineer Léopold Eyharts, a European Space Agency astronaut, to join the Expedition 16 crew. Eyharts will return to Earth aboard Endeavour.

In addition, the STS-123 crew will install the Canadian-built Dextre -- the final element of the station’s Mobile Servicing System -- and the Japanese Logistics Module - Pressurized Section, which is the first of three components of the Japan Aerospace Exploration Agency’s Kibo laboratory.

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

ANN's Daily Aero-Term (05.11.24): IDENT Feature

IDENT Feature The special feature in the Air Traffic Control Radar Beacon System (ATCRBS) equipment. It is used to immediately distinguish one displayed beacon target from other be>[...]

ANN's Daily Aero-Linx (05.11.24)

Aero Linx: Pararescue Air Force Pararescuemen, also known as PJs, are the only DoD elite combat forces specifically organized, trained, equipped, and postured to conduct full spect>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC