Norway Updates Preliminary Information From H225 Accident | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.14.24

Airborne-Unlimited-05.15.24 Airborne-AffordableFlyers-05.16.24

Airborne-Unlimited-05.17.24

Wed, Jun 01, 2016

Norway Updates Preliminary Information From H225 Accident

Thirteen On Board Were Fatally Injured, Three Possible Scenarios Under Consideration

The Norwegian Accident Investigation Board has updated its preliminary report from an accident involving an Airbus Helicopters H225 in which the Main Rotor Head (MRH) and mast suddenly detached from the aircraft enroute from the Gullfaks B oil rig to Bergen Airport Flesland. The helicopter impacted on a small island east of Turøy. All 13 people on board were fatally injured.

AIBN is now performing detailed examinations of particular components of the helicopter. The examinations are performed in Norway, England and France. The organized search for parts on land and in the sea is temporarily paused. However, important components are still missing, and the AIBN will likely resume the search in June.

According to the report, the helicopter was cruising at 2000 ft when the Main Rotor Head (MRH) and mast suddenly detached. The helicopter impacted on a small island and caught fire. The main wreckage thereafter ended in the sea where it came to rest at a depth of 1-9 meters. The accident was not survivable.

The recordings on the CVFDR showed that everything appeared to be normal until a sudden catastrophic failure developed in 1-2 seconds. The CVFDR recordings ended abruptly at the same time. There are no indications that flight crew actions were a factor in the accident. A spectral analysis of the CVR data has been carried out. There was no obvious indication of an abnormality before the sudden detachment of the rotor head.

On May 5, all the retrieved parts from the helicopter wreckage were taken from Haakonsvern to the AIBN premises in Lillestrøm, where all parts of particular interest for the investigation have been selected for more detailed inspections/examinations.

The AIBN has collected and secured relevant maintenance documentation. This material is currently the subject of a thorough analysis in parallel with the technical examinations. Detailed metallurgical examinations have been ongoing since 19 May, but are still at an early stage. So far, these examinations have not identified a conclusive primary cause of the accident.
Preliminary Analysis

The investigation team has discussed a list of scenarios that Airbus Helicopter prepared based on fault tree analysis. At this stage, the AIBN can confirm that the scenarios under consideration include failure of epicyclic module, suspension bar (lift strut) attachment and MGB conical housing.

(Images provided with AIBN report)

FMI: www.aibn.no/Aviation/Investigations/16-286?iid=19830&pid=SHT-Report-Attachments.Native-InnerFile-File&attach=1

Advertisement

More News

Classic Aero-TV: Remembering Bob Hoover

From 2023 (YouTube Version): Legacy of a Titan Robert (Bob) Anderson Hoover was a fighter pilot, test pilot, flight instructor, and air show superstar. More so, Bob Hoover was an i>[...]

ANN FAQ: Follow Us On Instagram!

Get The Latest in Aviation News NOW on Instagram Are you on Instagram yet? It's been around for a few years, quietly picking up traction mostly thanks to everybody's new obsession >[...]

ANN's Daily Aero-Linx (05.15.24)

Aero Linx: B-52H Stratofortress The B-52H Stratofortress is a long-range, heavy bomber that can perform a variety of missions. The bomber is capable of flying at high subsonic spee>[...]

ANN's Daily Aero-Term (05.15.24):Altimeter Setting

Altimeter Setting The barometric pressure reading used to adjust a pressure altimeter for variations in existing atmospheric pressure or to the standard altimeter setting (29.92).>[...]

Aero-News: Quote of the Day (05.16.24)

"Knowing that we play an active part in bettering people's lives is extremely rewarding. My team and I are very thankful for the opportunity to be here and to help in any way we ca>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC