NASA Delays SIRTF Launch | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Mon, Apr 21, 2003

NASA Delays SIRTF Launch

Booster Problems Cited

NASA managers have decided to postpone the launch of SIRTF (Space Infrared Telescope Facility) aboard a Boeing Delta II rocket until no earlier than mid-August 2003.

The delay will allow engineers enough time to change out one of the nine solid rocket motors attached to the Delta II rocket, which had multiple delaminations within the layers of material that comprise the engine-nozzle exit-cone liner.

"There simply is not enough time to remove and replace the rocket motor to support a SIRTF launch in advance of the Mars Exploration Rover-B launch window," said Karen Poniatowski, Assistant Associate Administrator for Launch Services at NASA Headquarters, Washington.

The upcoming launch dates of the Mars Exploration Rovers (MER A and B), also on Delta II rockets, are June 6 and June 25, respectively. The MER-A mission, originally scheduled for May 30, was recently rescheduled to June 6 due to a potential problem with cabling on the spacecraft.

The launch of the Galaxy Evolution Explorer mission, or GALEX, is on schedule for launch on a Pegasus rocket on April 28.

FMI: www.nasa.gov

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC