Bombardier Learjet 85 Flight Test Aircraft Fabrication Underway | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Mon, Oct 10, 2011

Bombardier Learjet 85 Flight Test Aircraft Fabrication Underway

Parts Being Manufactured, Tested In Mexico, Ireland, Wichita

Production of the new new Learjet 85 aircraft has officially begun as the program successfully exited the Aircraft Level Critical Design Review. Development and production teams in Wichita, Kansas; Montréal, Québec; Belfast, Northern Ireland; and Querétaro, Mexico, are actively engaged in the manufacturing validation phase.

“We have made solid progress,” said Ralph Acs (pictured), Vice President and General Manager, Learjet, Bombardier Business Aircraft, in a news conference Sunday at the NBAA convention in Las Vegas. “Our manufacturing sites are ready, production has begun, we have been successfully building parts and we are ensuring that all quality standards are met for the Learjet 85 aircraft’s entry into service in 2013.”

The Querétaro site is operational with production tooling in place. To date, several test fuselages and key elements of the composite structure have been produced at the facility to validate the manufacturing and assembly processes. In addition, a full-length composite fuselage has been assembled, and production of the first flight test vehicle is underway.

In Wichita, the first phase of expansion is complete and the site is ready for the start of final assembly. Phase two of the expansion plan, which includes building a new production flight facility, is scheduled to begin in 2012, while phase three - the paint facility and new delivery centre - is on track to be completed in 2013.

Production of wing spars and planks using Resin Transfer Infusion (RTI) technology was successfully launched at the Belfast site in spring 2011. Several sets of spars are now complete, and shipments to the Querétaro site, where wing assembly will take place, have begun.

The Learjet 85 aircraft program supply base has started the fabrication of parts, and is on track with approximately 40 per cent of dedicated supplier test rigs that are operational, running their respective systems prior to shipment to the final line. As part of Bombardier’s technology readiness program, over 12,000 test pieces have been produced to date. The first FAA structural certification test project was successfully completed this summer.

There are currently more than 1,700 employees working on the Learjet 85 aircraft program across Bombardier Aerospace’s sites worldwide.

FMI: www.bombardier.com

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC