F-35 Testing Aircraft Comes Full Circle | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Mon, Aug 13, 2012

F-35 Testing Aircraft Comes Full Circle

Aircraft Used In Static Test Program Returned To LMC In Fort Worth

After successfully completing the static test program on the F-35 (known as AG-1) BAE systems says it has returned the aircraft back to Lockheed Martin. BAE says the static test program broke all records for the speed of testing, having applied more than 150 different loading configurations in just over nine months. Now, after proving the strength of the aircraft, it is beginning the 4500 mile journey back to the U.S. after almost three and a half years in the structural test facility at Brough in the UK.

Static testing the F-35 means that the aircraft has been ‘flown’ to its limits with loads applied to it replicating the effect of high gravitational forces far beyond any conditions likely to be flown in actual flight.  This is done with the airframe nesting in a multi-million pound rig fitted with over 4000 strain gauges, 170 actuators and over 50 miles of wiring at our Brough site in Yorkshire. Brough is home to a facility well known for putting aircraft through their paces to ensure they are strong enough and resilient enough to perform in the harshest environments in the world.
 
“We certainly don’t give the aircraft an easy ride here," said Tim Bramhall, F-35 structural test program manager at Brough. "We push it to its limits so that we can be confident that each of the 3000+ aircraft that have been ordered will perform safely and effectively. The real challenge is keeping aircraft weight at a minimum while maintaining the strength of the plane within certain specified limits”   
 
“We still have another F-35 CTOL airframe in the facility undergoing fatigue testing along with the remaining "horizontal and vertical tails from the Carrier variant," Bramhall continued. Work on those continues on schedule and are shining examples of the long term future the structural test facility has ahead.”

FMI: www.baesystems.com

Advertisement

More News

ANN's Daily Aero-Term (05.07.24): Hazardous Weather Information

Hazardous Weather Information Summary of significant meteorological information (SIGMET/WS), convective significant meteorological information (convective SIGMET/WST), urgent pilot>[...]

ANN's Daily Aero-Linx (05.07.24)

Aero Linx: The T-6 Racing Association The T-6 Racing Association is all about T-6‘s and racing. Our mission is to bring great racing to our fans in Reno and other venues wher>[...]

Airborne 05.01.24: WACO Kitchen, FAA Reauthorization, World Skydiving Day

Also: Electra Aero, AMO-CBP v Smugglers, Naval King Airs, Boeing Deal To the surprise of everyone involved, Waco Kitchen shut down both airport operations with little warning and h>[...]

Airborne Affordable Flyers 05.02.24: Bobby Bailey, SPRG Report Cards, Skydive!

Also: WACO Kitchen Bails, French SportPlane Mfr to FL, Dynon-Advance Flight Systems, Innovation Preview Bobby Bailey, a bit of a fixture in sport aviation circles for his work with>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC