STS-107: Mission Summary | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Sat, Feb 01, 2003

STS-107: Mission Summary

STS-107 Flight: January 16-February 1, 2003

Crew:

Commander Rick D. Husband (second flight),
Pilot William C. McCool (first flight),
Payload Specialist Michael P. Anderson (second flight),
Mission Specialist Kalpana Chawla (second flight),
Mission Specialist David M. Brown (first flight),
Mission Specialist Laurel B. Clark (first flight),
Payload Specialist Ilan Ramon, Israel (first flight)

Payload:

First flight of SPACEHAB Research Double Module; Fast Reaction Experiments Enabling Science, Technology, Applications and Research (FREESTAR); first Extended Duration Orbiter (EDO) mission since STS-90. This 16-day mission is dedicated to research in physical, life, and space sciences, to be conducted in approximately 80 separate experiments, comprised of hundreds of samples and test points. The seven astronauts worked 24 hours a day, in two alternating shifts. 28 flights 1981-2003.

First flight:

April 12-14, 1981 (Crew John W. Young and Robert Crippen)

Most recent flight:

STS-109, March 1-12, 2002 Hubble Space Telescope Servicing Mission

Other notable missions:

STS 1 through 5, 1981-1982 first flight of European Space Agency built Spacelab. STS-50, June 25-July 9, 1992, first extended-duration Space Shuttle mission. STS-93, July 1999 placement in orbit of Chandra X-Ray Observatory.

Past mission anomaly:

STS-83, April 4-8, 1997. Mission was cut short by Shuttle managers due to a problem with fuel cell No. 2, which displayed evidence of internal voltage degradation after the launch.

FMI: www.nasa.gov

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC