A400M Program Review Completed | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Mon, Dec 04, 2006

A400M Program Review Completed

Electrical Harnesses May Pose Problems Ahead

Aero-News has learned the two month-review of the Airbus A400M program, mandated by the CEOs of European Aeronautic Defense and Space Co. (EADS) in September, was completed last week through presentations to Europe's Organisation Conjointe de Coopération en matière d'ARmement (OCCAR) and the Board of Directors at EADS.

Airbus reports that overall, the review validated that the A400M program is currently progressing according to the contractually agreed schedule. However, EADS states several "significant" challenges lie ahead before the first delivery of the military-spec turboprop transport in 2009.

Those risk areas include systems design, and in particular electrical harnesses; maturity of military mission systems; engine modifications; and remaining work to be done on the Final Assembly Line.

The European planemaker called the review the most comprehensive assessment ever done on an EADS development program. The review team -- which incorporated external experts and "veterans" from the A380 review of last summer -- conducted intensive program management and floor level interviews, industrial site visits and data analysis, capitalizing on reference data from the A380 and other programs as far as applicable.

The review team has proposed detailed mitigating actions to comply with the delivery schedule committed to customers. These actions were endorsed by the CEOs of EADS and the Board of Directors.

Implementation will be followed by EADS Co-CEOs Louis Gallois and Thomas Enders personally, on a bimonthly basis.

FMI: www.airbus.com

Advertisement

More News

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Term (05.06.24): Altitude Readout

Altitude Readout An aircraft’s altitude, transmitted via the Mode C transponder feature, that is visually displayed in 100-foot increments on a radar scope having readout cap>[...]

ANN's Daily Aero-Linx (05.06.24)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC