NASA's Stennis Space Center Begins New Chapter In Space Exploration | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Fri, Aug 24, 2007

NASA's Stennis Space Center Begins New Chapter In Space Exploration

Testing To Begin Soon On Ares J-2X Engines

NASA's Stennis Space Center broke ground Thursday for a new rocket engine test stand that will provide altitude testing for the J-2X engine. The engine will power the upper stages of NASA's Ares I and Ares V rockets.

NASA Deputy Administrator Shana Dale was joined by Mississippi Gov. Haley Barbour, US Sen. Thad Cochran, US Sen. Trent Lott and US Rep. Gene Taylor for the landmark occasion.

Also participating were NASA Associate Administrator for Exploration Systems Scott Horowitz and Stennis Center Director Richard Gilbrech, recently named to succeed Horowitz, who plans to leave NASA in October. Pratt & Whitney Rocketdyne President Jim Maser took part as well.

"Groundbreakings are about new beginnings," said Dale. "The first stand was erected at Stennis to test the Saturn V rocket of the Apollo program. Testing of the space shuttle engines began here in the mid 1970s. And today, we're breaking ground for a new test stand, for the new spacecraft of a new era of exploration."

The Ares I and Ares V rockets are being developed as part of NASA's Constellation Program. Constellation spacecraft will be used to send astronauts to the International Space Station, return humans to the moon, and eventually journey to Mars.

"This is our generation's turn, our time to go to the moon," said Gilbrech. "One of the key steps is building the A-3 test stand. The J-2X engine has a unique set of test requirements. The best way to meet them is with the A-3."

The A-3 stand is the first large test stand to be built at Stennis since it opened in the 1960s. The new test stand will be a 300-foot-tall, open steel frame structure located south of the existing A-1 test stand. Its 19-acre site in Stennis' A Complex will include a test control center, propellant barge docks and access roadways.

The test stand will allow engineers to simulate conditions at different altitudes by generating steam to reduce pressure in the test cell. Testing on the A-3 stand is scheduled to begin in late 2010.

In November 2006, Stennis' existing A-1 stand was handed over to the Constellation Program for testing the J-2X engine. Tests on J-2X components are set to begin later in 2007.

"The engines will be assembled here at Stennis, then subjected to rigorous, expert testing," Dale said. "After that, those engines and the rockets they will power will travel to Cape Canaveral. Then the finished spacecraft will lift off, headed for a new destination and a new era of exploration."

FMI: www.nasa.gov/constellation

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC