Boeing Looks At Increasing Dreamliner Production To Meet Demand | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Fri, Jun 09, 2006

Boeing Looks At Increasing Dreamliner Production To Meet Demand

Company Will Make Final Decision This Summer

Have you ever heard the old saying, "you have gotta make hay when the sun shines?" Well, Boeing has a bumper crop of customers waiting to take delivery of its upcoming 787 Dreamliner series of airliners... and as Airbus mulls over what to do with its competitor to the composite aircraft, more customers are looking in Boeing's direction.

Boeing has one small problem with that, albeit an enviable one: the 787 is already sold out for its first two years of production, and slots in 2011 are filling up fast.

So, what is Boeing to do? Boeing's VP of commercial airplane marketing, Randy Baseler, told Reuters recently the only answer may be to double production capacity for the 787.

"There are still a lot of people who want planes," he said.

Boeing already has 347 firm orders for the composite-bodied aircraft... and in addition to speeding up existing deliveries, adding a second line would also allow potential customers like Qatar Airlines and Israel's El Al to order planes, and have them delivered sooner than they'd have to wait for Airbus's plane to be ready... a major selling point.

Boeing is expected to make its decision this summer... and while adding a second line seems to be a no-brainer, there's also the matter of what to do with that second production line, once demand for the 787 slows down.

Well, there's always the talked-about replacement for the 737...

FMI: www.boeing.com

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC