Manufacturing Underway Soon On Piperjet Altaire | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Wed, Jul 27, 2011

Manufacturing Underway Soon On Piperjet Altaire

Mockup Back On The Summer Circuit

Piper Aircraft has started fabrication and assembly will begin in August of the first conforming flight test article of the company’s new single engine Altaire business jet. The inaugural flight of the conforming PiperJet Altaire is planned for 2012 with certification and deliveries in 2014.

“The Altaire is pioneering the single-engine business jet, just like the Piper Meridian and other single-engine turboprops have proven in rigorous worldwide use that the fundamental efficiencies and safety of centerline thrust aircraft deliver the greatest value to owners and operators,” said Piper President and CEO Geoffrey Berger.

“The advantage that Piper has over other manufacturers with an interest in a single-engine jet is a solid underlying commitment by Imprimis, the owner of the company, to appropriately fund the program and see it through to successful completion,” Berger says. Currently Piper has assigned nearly 200 engineers and production staff to deliver on the promise of an entry-level business jet with the economics of a turboprop and the cabin size and capabilities of a much larger business jet.

In addition to starting assembly of the first conforming flight test article, later this year Piper will begin fabrication and assembly of a structural test article, which will eventually be joined by three additional flying conforming test aircraft to become part of the certification program. Also part of the FAA certification program will be a bird strike canopy and a fuel cell/vibration test wing. Construction of all of these articles will be underway during 2012.

The company is in the midst of a $5.6 million program in building improvements to ready facilities at its Vero Beach, Fla. manufacturing and headquarters campus for necessary production, final assembly, completion and deliveries. Recently it named Altaire Chief of Production Michael Dow to oversee the manufacturing of the business jet.

A mockup of the PiperJet Altaire is on display at the Piper EAA AirVenture 2011 Exhibit. The Wisconsin stop is part of a continuing North American tour of the Altaire mockup at various aviation venues and presentations by Piper dealers so that customers and prospective customers can experience for themselves the spacious cabin and cockpit.

FMI: www.piper.com

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC